Similar Projects
Little Scholars Academy
Renovation - 2,895 SF
Design
Huntersville, NC 28078

CMAQ Sidewalk Improvements
Post-Bid
Claremont, NC

Rockingham Community College Parking Lot Restriping and Patching
Post-Bid
Wentworth, NC 27375

Driveway Repairs for Durham County Fire Stations
Results
Durham, NC

Sunset Streetscape Improvements
Results
Blowing Rock, NC

North Main Street and Lexington Avenue Intersection and Utility Improvements
Post-Bid
High Point, NC

Haywood Streetscape
Results
Less than $4,749,345 est. value
Asheville, NC

West Water Street Parking Lot Expansion
Post-Bid
Lincolnton, NC

Wilson Street Sidewalk
Results
Wingate, NC

Parking Lot Asphalt Replacement
Post-Bid
Raleigh, NC 27607

North Academic Drive Renovation Project
Results
Less than $1,808,000 est. value
NC

Poston Park ADA Trail
Post-Bid
Lowell, NC

Little Sugar Creek Greenway and Stream Enhancement Project, I-485 to Polk Street
Results
Pineville, NC 28134

Glen Eden Tennis Access Sidewalk
Post-Bid
Raleigh, NC

Edgewood Road Parking Lot
Results
Asheville, NC 28804

Last Updated 01/02/2020 01:59 PM
Project Title

Morganton Downtown Revitalization Project - North Green Street Sidewalk Improvements

Physical Address View project details and contacts
City, State (County) Morganton, NC   (Burke County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves the grading, demolition, forming and landscaping for construction of concrete sidewalk and curb and gutter. The selected Contractor for the project shall be responsible to work with and coordinate the project the General Contractor for the Hotel project at 400 N Green Street and also work with the City of Morganton Electrical Department in their schedule for installation of conduit and light poles. The concrete work shall be conducted in conjunction with the schedule for the Hotel project. HUB certified/minority businesses goal is 10%

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents