Similar Projects
Modernize Electrical and HVAC Redundancy
Design
$5,000,000 to $10,000,000 est. value
Clovis, NM 88101

El Vado Hydroelectric Plant Transformer Replacement Project
Bidding
El Vado, NM 87544

On-Call Electrical Contractor Services
Post-Bid
Los Alamos, NM 87544

Ups With Installation
Post-Bid
NM

1000 KVA 3 Ph Padmount Distribution Transformer
Results
Aztec, NM

Electrical Services
Results
Clovis, NM 88101

Z--CAVE 169636 - Replace Old/Failing Primary Electric
Post-Bid
$5,000,000 to $10,000,000 est. value
Carlsbad, NM 88220

Concrete Vaults and Pads
Results
Less than $13,284 est. value
Aztec, NM

Casino Lighting Retrofit and Installation
Post-Bid
Albuquerque, NM 87113

Replace Emergency Generator at Alamogordo Police Department
Results
Less than $77,554 est. value
Alamogordo, NM 88310

Electrical/Mechanical Design and Installation
Post-Bid
Albuquerque, NM 87113

SJCP Chama Office Shop Lighting
Results
Chama, NM 87520

Fiber Construction
Post-Bid
Carlsbad, NM 88220

N--Chama SCADA Replacement San Juan-Chama Project, C
Results
San Juan, NM 140R4019Q0

Transformers
Post-Bid
$1,000,000 to $5,000,000 est. value
Clovis, NM 88101

Last Updated 12/29/2020 11:37 AM
Project Title

Eb Transformer Oil/Neutral Bushing Repla

Physical Address View project details and contacts
City, State (County) Truth or Consequences, NM   (Sierra County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. The contractor shall provide the equipment and tankers needed to remove and store the oil of (3) transformers to allow the replacement of (3) neutral bushing. 2. The Government will replace the neutral bushings. After the Government changes the neutral bushings, the contractor shall refill the transformer with the oil that was removed and kept in the tankers. 3. The contractor will put a vacuum and provide a nitrogen blanket in the transformer. 4. The contractor shall conduct a Power Factor Test, TTR (Transformer Turns Ratio) test, and an Insultation Resistance Test in accordance with the FIST 3-30 Transformer Maintenance Standard. 5. The contractor shall document the results of the tests in a comprehensive engineering report which shall include findings, test data, and recommendations for corrections, if applicable. The report will be furnished 30 of days after completion of work.

Details

Division 26 - Electrical, Medium-Voltage Transformers, Low-Voltage Transformers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents