Similar Projects
HTC Center Water Heater Replacement
Renovation
Sub-Bidding
$130,000 CJ est. value
Conway, SC 29526

Plumbing Services IDC
Alteration
Post-Bid
Beaufort, SC

On Call Plumbing Services
Alteration
Post-Bid
Richland, SC

Saluda River 02 (SR02) Engineer-LED Find and Fix (SS7583) CDBE
Alteration
Results
Columbia, SC

Supplemental Plumbing Services
Alteration
Results
Clemson, SC

Water Cooler Installation Services
Alteration
Post-Bid
Anderson, Easley, Pendleton, Seneca, Westminster, SC 29670

Ashley River Tower Facade Repairs
Alteration
Results
Charleston, SC

On-Call Plumbing Services
Alteration
Post-Bid
Rock Hill, SC

Darlington County Virtual Academy Plumbing
Alteration
Results
$60,000 est. value
Hartsville, SC 29550

Storm Water Devices - Maintenance and Service
Term Contract
Post-Bid
Greenville, SC 29601

Darlington High School Plumbing
Alteration
Results
$60,000 est. value
Darlington, SC 29532

Bathroom Modification - Cultured Marble Shower Installation
Renovation
Post-Bid
$20,000 CJ est. value
Simpsonville, SC 29681

Racetrack Road Water Line
Infrastructure
Results
$188,825 CJ est. value
Woodruff, SC 29388

Hourly Rates and Parts Mark-up For Pump Repairs
Term Contract
Post-Bid
Anderson, SC 29621

I-85 Corridor Sewer Expansion Divisions I and II
Infrastructure
Results
$12,311,447 CJ est. value
Fair Play, SC 29643

Last Updated 04/28/2023 12:13 PM
Project Title

EFD - Hose Rack

Physical Address View project details and contacts
City, State (County) Edgefield, SC 29824   (Edgefield County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $12,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Award: G&H Construction The Town of Edgefield is seeking sealed bids for the construction of a fire hose drying rack. For more information call 803 - 637 - 4014 or email ccheatham@exploreedgefield.com. The Town of Edgefield has the right to accept or reject any and all bids. The Town of Edgefield is seeking sealed bids for the construction of a fire-hose drying rack behind the Fire Department located at 400 Main Street in Edgefield, South Carolina. The currently installed rack may be viewed at the location until it is dismantled in preparation for construction of the new one. The new rack will have to meet all building codes and shall be built to the following requirements: Rack will be situated in an East-West orientation with the deck portion located to the East, which will allow for easier loading of hoses from the bed of pickup trucks backed up to it from the parking area; it should be noted that this is opposite the current installation. The rack/deck shall be constructed of #2 graded pressure-treated 2" X 6" lumber and the entire deck/rack surface will be boarded to allow for walking on it. The decking and all non-structural timber will be attached with 3" outdoor decking screws. The entire structure shall be built to a 100 psf wet-service joist live load rating with 2" X 8" PT lumber used for the floor joists attached to 6" X 6" posts. The 6" X 6" post shall rest on a concrete brick, a minimum of 18" in the ground with the space filled with concrete. All structural members will be attached with Lag bolts. The dimensions of the rack portion shall be 16' wide and 52' in length. This rack shall be attached to the 4' X 16' deck. The deck portion shall be fully railed on the high end with one (1) set of access steps located on the east of the deck. Railing shall be provided also as to meet code requirements. The rack shall be connected to the deck in such a manner to allow for positive water drainage at a slope of 1.5/12 to 2/12. The lower edge of the rack at the parking lot shall be no more than a standard 7 3/4 " step height above grade. Spacing between the decking boards shall be 1/2 " to allow for water drainage. A 3' wide walking area in the center of the rack shall be provided with traction toe boards in the North-South orientation from the lower end up to the deck spaced at 2' apart. Provider is responsible for removal of all construction debris only; existing structure will be dismantled and removed by the Town of Edgefield.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents