Similar Projects
Drainage Repairs
Bidding
Less than $225,000 est. value

Sidewalk and Drainage Improvements - South Holiday Road
Results
De Funiak Springs, FL

Drainage
Results
Less than $800,000 est. value
FL

Drainage
Results
Less than $220,000 est. value
FL

Hotz Avenue Outfall Construction
Results
FL

Drainage Repairs
Results
Less than $150,000 est. value

Drainage Outfall Repair
Results
Less than $225,000 est. value
FL

Legion Park Seawall Improvements
Results
Miramar Beach, FL

Kellogg Bayfront Park Seawall Replacement
Results
Less than $305,000 est. value
FL

County Highway 2A Cross Drain Replacement
Results
Less than $950,215 est. value
FL

Drainage
Results
Less than $500,000 est. value

Drainage
Results
Less than $1,387,468 est. value
FL

Grading
Results
Less than $569,180 est. value
FL

Seven Runs Creek Streambank Restoration Project
Results
Less than $139,852 est. value
Bruce, FL 32455

Drainage
Results
Less than $335,077 est. value
FL

Last Updated 08/09/2019 06:28 AM
Project Title

Drainage

Physical Address View project details and contacts
City, State (County) FL   (Walton County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $303,910
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Contract consist of the installation of Gabion Mattresses for ditch and slope refurbishment for designated locations, along State Road 8 (Interstate 10) Westbound between Mile Marker 89 (Milepost 21.994) west to Mile Marker 86 (Milepost 18.974) in Walton County. Spoil material removed from ditches may be relocated to FDOT storage pit in Argyle, as directed by the Engineer. All Maintenance of Traffic, Mobilization, and Regular Excavation shall be paid for as incidental to the price of Gabion Mattresses. Section 0001 Sodding (Sy) 0104- 10- 3 Sediment Barrier Lf 300.000 0120- 2- 2 Borrow Excavation, Truck Measure Cy 400.000 0121- 70- 2 Flowable Fill, Maintenance Contracts Only Cy 1.000 0530- 5- 1 Gabion, Up To 1 Foot Thickness Sy 4,900.000 0570- 1- 2 Performance Turf, Sod Sy 1,115.000 e110- 2- Clearing & Grubbing Ac 0.700 e577- 70- Shoulder Rework Sy 4,500.000
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents