Similar Projects
Reported | 03/13/2020 12:00 AM |
Project Title | 2020 Asphalt Maintenance Project |
Physical Address | View project details and contacts |
City, State (County) | Maysville, CO 81201 (Chaffee County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency - 03/12/20 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. This project consists of milling and overlay of roadways, curb and gutter point repairs, and placement of millings at an existing parking lot. 2. Contractor to accommodate and provide pedestrian access to properties throughout the duration of the work and special accommodations when needed. 3. Overlay work asphalt mix design shall have FORTA fiber added at a rate of a bag per ton of asphalt. 4. Milling shall consist of profile milling to crown where feasible. Maximum mill depth at curb of 1.75-inches and minimum mill depth at crown of 0.00-inches. Adjustments are anticipated in the field to accommodate quarter crown when necessary to maintain specified asphalt thickness. See geotechnical cross-sections for more information. 5. Milling shall include 50-ft transition milling at tie-in locations. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |