Similar Projects
Material Proposal 2022 Seal Coat
Alteration
Design
Auburn, IL

Sidewalk Improvements - Chatham Parks
Infrastructure
Bidding
$280,000 est. value
Chatham, IL

Repair/Resurface Roadways and Sidewalks
Infrastructure
Bidding
$7,000,000 est. value
Springfield, IL 62702

Underground Parking Ramp Coating
Infrastructure
Post-Bid
Springfield, IL

Chatham Road Overlay - Lelend Grove
Infrastructure
Post-Bid
Springfield, IL

Repair/Resurface Roadways and Sidewalks
Results
Less than $2,500,000 est. value
Springfield, IL

FY2022 Sidewalk Program
Results
Springfield, IL

Parking Consolidation Zone 2
Infrastructure
Post-Bid
Springfield, IL

CWLP Traffic and Metering Lot Replacement
Term Contract, Infrastructure
Results
Springfield, IL 62703

Resurface POV Parking Lot Around Building 2
Infrastructure
Post-Bid
Less than $1,500,000 est. value
Springfield, IL 62702

Removal and Replacement of a Portion of the Existing Parking
Infrastructure
Results
Springfield, IL

FY2023 Concrete Patching
Term Contract, Infrastructure, Alteration
Post-Bid
Springfield, IL

Repair/Resurface Roadways and Sidewalks
Infrastructure
Results
Less than $3,000,000 est. value
Springfield, IL 62702

FY2023 Bituminous Improvements
Infrastructure
Post-Bid
Springfield, IL

Upgrade Parking Lot/Site Lighting
Infrastructure, Alteration
Results
Less than $800,000 est. value
Springfield, IL 62703

Reported 06/14/2022 12:00 AM
Project Title

High School Parking Lot Maintenance Project

Physical Address View project details and contacts
City, State (County) Riverton, IL   (Sangamon County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This work consists of preventative maintenance to the high school and elementary parking lots, including routing and sealing, slurry seal, and patching. The work is required to be completed by July 31, 2022.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents