Similar Projects
River Ring Towers
New Construction - 50,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
NY 11249

Canandaigua Finger Lakes Resort & Hotel
New Construction - 195,000 SF
Design
$54,000,000 est. value
Canandaigua, NY 14424

Gateway Lofts
New Construction, Renovation - 100,000 SF
Design
$34,000,000 est. value
Jamestown, NY 14701

Alexan Westchester
New Construction - 770,146 SF
Post-Bid
$50,000,000 est. value
Harrison, NY 10604

Urban Air Adventure Park
Build-Out - 50,153 SF
Post-Bid
Latham, NY 12110

Building 107 Remodel and Fitness Center
Renovation
Results
$100,000 to $250,000 est. value
Newburgh, NY

Holiday Inn Express
New Construction
Construction
New Rochelle, NY 10801

Beacon HIP Lofts & Storage
New Construction, Renovation, Addition - 555,000 SF
Construction
$8,500,000 est. value
Beacon, NY 12508

Liberty Mixed Use
New Construction, Renovation, Addition
Pending Verification
Liberty, NY 12574

West Hill Multi-Family
New Construction
Pending Verification
Wallkill, NY 12589

Westchester Place - Huguenot Street Mixed Use
New Construction - 171,416 SF
Design
New Rochelle, NY 10801

AloYoga
Renovation - 5,335 SF
Post-Bid
New York, NY 10065

10 Commerce Drive Residential
New Construction - 204,976 SF
Construction
$57,000,000 est. value
New Rochelle, NY 10801

F45 Training
Build-Out - 2,250 SF
Pending Verification
Scarsdale, NY 10583

South Broadway Hotel
New Construction
Design
Saratoga Springs, NY 12866

Last Updated 05/25/2021 09:37 AM
Project Title

Fitness Center Renovation

Physical Address View project details and contacts
City, State (County) Newburgh, NY   (Orange County)
Category(s) Entertainment/Recreation
Sub-Category(s) Fitness Center
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the renovation of the interior of an existing building and to expand the existing fitness center into a bigger and modern Multi-Purpose fitness center. The work includes, but is not necessarily limited to: demolition, carpentry, flooring, electrical, HVAC, lighting, fire suppression and associated safety features.

Details

Fitness Center, Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents