Similar Projects
Red Del Papa Well House (IF) - 731130 - City of Tooele
New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Tooele, UT 84074

Townhomes on Willow
New Construction, Infrastructure
Conception
$37,000,000 CJ est. value
Grantsville, UT 84029

Fire Station Building 3 - City of Tooele
New Construction, Infrastructure - 15,000 SF
Design
$4,000,000 CJ est. value
Tooele, UT 84074

MUNI - Subdivision - Residential Subdivision / 600 East 2400 North - Cook Builders
New Construction, Infrastructure
Design
Tooele, UT 84074

2023 Roadway Maintenance Project
Infrastructure
Bidding
$330,000 CJ est. value
Tooele, UT 84074

RFQ D/B - New Town Shop Building
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Stockton, UT 84071

New Burt Brothers Tires and Service
New Construction, Infrastructure
Post-Bid
$700,000 CJ est. value
Tooele, UT 84074

RFP Construction Manager - TTC Expansion & Renovation
New Construction, Infrastructure - 12,000 SF
Post-Bid
$19,250,000 CJ est. value
Tooele, UT 84074

Park Well House and Waterline
Infrastructure
Results
$2,376,624 CJ est. value
Tooele, UT 84074

Tooele England Acres Park and Trail Project
New Construction, Infrastructure
Results
$2,245,246 CJ est. value
Tooele, UT 84074

Boyer Lakeview One / Grantsville
New Construction, Infrastructure - 500,000 SF
Construction
$106,000,000 CJ est. value
Grantsville, UT 84029

Western Acres Phase 1
New Construction, Infrastructure
Construction
$50,000,000 CJ est. value
Tooele, UT 84074

Tagg N Go Car Wash / Tooele
New Construction, Infrastructure - 55,756 SF
Pending Verification
$1,000,000 CJ est. value
Tooele, UT 84074

Breezeway Apartments
New Construction, Infrastructure
Pending Verification
$8,000,000 CJ est. value
Tooele, UT 84074

Rush Valley Firework Restriction 2022
Infrastructure
Design
Rush Valley, UT 84069

Last Updated 07/12/2023 05:10 PM
Project Title

RFP D/B - Destination Playground at Deseret Peak

Physical Address View project details and contacts
City, State (County) Grantsville, UT 84029   (Tooele County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This courtesy posting is an advertisement of a procurement opportunity for Tooele County, not the Division of Purchasing. Responses should be directed to the designated individual/office as designated in the solicitation document. The Division of Purchasing does not accept responses for courtesy postings. The contract award for this solicitation will not be posted . Instead, you will need to contact the designated individual/office as identified in the solicitation document. This solicitation posting will be canceled/closed upon the closing date of this solicitation; however, a vendors response will still be evaluated by Tooele County as described in the solicitation document. The Division of Purchasing is neither the issuing nor conducting procurement unit for this solicitation, as such it is the vendors responsibility to review the entire solicitation in order to comply with any requirements. Please note that there is a 50 MB limit on a single file upload. Acceptable File Types are DOC, DOCX, XLS, XLSX, CSV, PDF, PPT, JPG, GIF, PNG, TIFF, and .ZIP. The MAC Version of Word (Pages) is not an acceptable file type. The file must be converted to PDF to upload. Tooele County (County) is requesting proposals from a qualified company to design and build a destination playground for the Deseret Peak Complex (DPC), located at 2930 UT-112, in Grantsville, UT 84029. Please provide a detailed schedule the includes a completion date prior to December 31, 2023. Questions Due July 13, 2023 @ 4 PM Countys Response to Questions July 14, 2023 @ 4 PM If you need more information on this event, please contact: Cody Peterson codypeterson@utah.gov Successful offeror will be responsible for the following: Design of a modern destination playground at the Deseret Peak Complex. The approximate footprint of the playground should be 55,000 to 60,000 square feet, or 300' x 200' - including equipment, surfacing, benches, small pavilions, permanent shade structures (no canvas shades), and seating. All equipment and surfacing must meet and/or exceed all federal, state, CPSC, ASTM, & IPEMA guidelines. Playground should have a good variety of all abilities accessible features and apparatuses with high playability. Playground should have sections for different age groups Playground must include ziplines Playground must have a recognizable theme that relates to Tooele County. Multiple designs and themes can be submitted. Construction of playground - all equipment shall be installed by a factory trained and certified installer. Any and all sub-contractors and is to provide all labor, tools, equipment, permits, engineering, plans, and any and all other costs necessary to the design, layout, and construction. Successful offeror must coordinate with general contractor and project manager for time table to install playground

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents