Similar Projects
F-35 Repair Fuel Cell, Bldg 1203
Renovation
Design
$5,000,000 to $10,000,000 est. value
Montgomery, AL 36108

Security and Services Training Facility
New Construction - 22,500 SF
Design
$5,000,000 to $10,000,000 est. value
Birmingham, AL 35212

Material Exploitation Center (MEC) at Redstone Arsenal
Addition, Demolition, Infrastructure - 9,890 SF
Bidding
$250,000,000 CJ est. value
Redstone Arsenal, AL 35808

Repair Maxwell AFB Elementary School Building 538A and 538A1
Renovation
Bidding
$25,000,000 CJ est. value
Montgomery, AL 36112

187 FW F35 Simulator & Base Supply New Construction
New Construction - 58,000 SF
Post-Bid
$10,000,000 to $25,000,000 CJ est. value
Montgomery, AL

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Repair Weapon Release B1312
Renovation
Results
Montgomery, AL

FMTC and Pelham Range IT Modernization
Renovation
Results
$270,000 est. value
Anniston, AL

Foley Readiness Center
New Construction - 15,165 SF
Construction
Less than $13,000,000 est. value
Foley, AL 36535

FMTC Transient Training Barracks Complex
New Construction
Construction
$20,498,844 est. value
Anniston, AL 36205

RFQ Design - Replace Windows Phase 3
Renovation
Pending Verification
$10,000,000 CJ est. value
Birmingham, AL 35233

Renovation of Communications Building 1109
Infrastructure, Renovation
Design
$5,000,000 CJ est. value
Montgomery, AL 36108

MARFORRES Huntsville Whole Center and ATFP Renovations
Renovation
Bidding
$1,000,000 CJ est. value
Huntsville, AL 35801

Fy21 Srm 81St Rd Resets, Montgomery, Al (Al036)
Renovation
Post-Bid
$500,000 to $1,000,000 est. value
AL 36109

Tallassee Restoration
Renovation
Results
$4,800,000 est. value
Tallassee, AL 36078

Last Updated 08/25/2022 12:33 AM
Project Title

Montgomery (JFHQ) Renovations

Physical Address View project details and contacts
City, State (County) Montgomery, AL 36109   (Montgomery County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $2,214,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Certified checks or bid bonds (Power of Attorney is required) payable to The Armory Commission of Alabama in an amount not less than five (5) per cent of the amount of the bid, but in no event more than $10,000.00 per project, must accompany the bidder's proposal. Completed Disclosure Statements are preferred to accompany the proposal. Performance and Payment bonds will be required at the signing of the contract. All entities must be registered to do business in the State of Alabama. All bidders bidding in amounts exceeding $50,000.00 must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975. Any prospective bidders other than "official plan holders" must notify, in writing, JMR+H Architecture of their intent to bid the project by 2:00 p.m., CDT, Tuesday, July 5, 2022. Bid Result : Bid Item A - Hutcheson Construction Co,, Inc - 430,000.00 Bid Item B - Hutcheson Construction Co,, Inc - 592,000.00 Bid Item C - Hutcheson Construction Co,, Inc. - 947,000.00 Bid Item D - Pemberton. Inc. - 245,000.00

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents