Similar Projects
Install Chill Water Pumps
Term Contract
Post-Bid
CA 95652

Big Horn Groundwater Well 7 Downhole Construction
Infrastructure
Post-Bid
$1,280,000 est. value
Elk Grove, CA 95757

Treated Water Booster Pumps
Alteration
Results
CA

Groundwater Flush to Waste Project
Infrastructure
Results
Sacramento, CA 95838

FWTP Well Testing and Design
Infrastructure
Post-Bid
Sacramento, CA 95826

CA-Stone Lakes NWR-Pumps Rehab
Term Contract
Results
Elk Grove, CA

Well Site Feasibility
Infrastructure
Post-Bid
Sacramento, CA

Seasons Well (W-41) Pump Rehabilitation Project
Infrastructure
Results
$110,000 est. value
Sacramento, CA

Sierra Well Construction Project
Infrastructure
Post-Bid
Carmichael, CA

Relief Wells Inspection and Rehabilitation, Phase II
Infrastructure
Results
Sacramento, CA 95815

Well Replacement Project at Brannan Island
Infrastructure
Post-Bid
$115,000 est. value
Rio Vista, CA 94571

38--Folsom Dam Backup Emergency Pump, Motor and Coupler
Term Contract
Results
Folsom, CA

Well Destruction Program
Demolition
Results

Legends Well (W-76) Rehabilitation
Infrastructure
Results
$120,000 est. value
Sacramento, CA

Mather Housing Well Rehabilitation
Infrastructure
Results
$100,000 est. value
Mather, CA 95655

Last Updated 05/23/2022 02:42 AM
Project Title

Water Treatment Plant Backwash and Recycled Water Capacity Project

Physical Address View project details and contacts
City, State (County) Folsom, CA 95630   (Sacramento County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is generally described as demolition of three existing submersible decant pumps, installation of three new submersible decant pumps, replacement of piping, influent shear/slide gates, valves, and other appurtenances for the Decant Pump Station, installation of approximately 175 linear feet of 36” welded steel RBW pipe and valves, temporary bypass pumping substituting for the Decant Pump Station and temporary water barrier in the Reclamation Backwash Basin (RBB), miscellaneous civil sitework including AC pavement and concrete replacement associated with the Work, and associated electrical, instrumentation, and controls.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents