Similar Projects
US 395/Kennewick - W 19th Ave Noise Walls
Infrastructure
Conception
$2,851,000 CJ est. value
Kennewick, WA 99336

I-82/Columbia River Bridge at Umatilla EB - Bridge Painting Stage 2
Infrastructure
Conception
$20,376,000 CJ est. value
Kennewick, WA 99338

US 730/5.2 Miles N of Oregon Border - Rockfall Prevention
Infrastructure
Design
$1,166,000 CJ est. value
Benton City, WA 99320

US 730/3.0 Miles N of Oregon Border - Rockfall Prevention
Infrastructure
Design
$1,738,000 CJ est. value
Kennewick, WA 99337

Community Housing Development Organization (CHDO) Affordable Housing Development
New Construction, Infrastructure
Bidding
$425,050 CJ est. value
Richland, WA 99352

RFQ Contractor - Construction of Hop Picker Building
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Prosser, WA 99350

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

2022 Bituminous Surface Treatment
Infrastructure
Results
$350,000 to $400,000 est. value
Kennewick, WA

I-82, Coffin Rd Vicinity Paving
Infrastructure
Results
$400,000 to $500,000 est. value
WA

X-Energy Reactor Nuclear Plant - Tri-Energy Partnership
New Construction, Infrastructure
Pending Verification
$2,400,000,000 CJ est. value
Richland, WA 99352

X-Energy Reactor Nuclear Plant - Tri-Energy Partnership
New Construction, Infrastructure
Pending Verification
$2,400,000,000 CJ est. value
Richland, WA 99352

I-82: Eastbound Umatilla (Columbia River) Bridge
Renovation
Design
$18,569,640 CJ est. value
Kennewick, WA 99337

DRParking Underground Tank Removal
Renovation, Infrastructure
Bidding
$315,400 CJ est. value
Richland, WA 99354

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

Last Updated 06/29/2023 10:13 AM
Project Title

US 395, Pioneer Memorial Bridge - Bridge Painting Stage 2

Physical Address View project details and contacts
City, State (County) Kennewick, WA 99338   (Benton County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $17,896,684 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Cleaning and painting the metal surfaces of the bridge approach girders, main span upper arch and verticals and other work. Involves 23 items and 340 working days. Work class 8. County Benton County Franklin County Estimated value Under $30,000,000 WA DOT - US 395, Pioneer Memorial Bridge - Bridge Painting Stage 2

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents