Similar Projects
Burns Harbor Dredging Fy21
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Burns Harbor, IN

Aqua Avon WWTP Expansion Phase VI
Post-Bid
Avon, IN 46123

Butler WWTP Upgrades
Post-Bid
Butler, IN 46721

Water Pollution Control Plant Trim Blower Improvements
Results
Fort Wayne, IN

Wastewater System Improvements
Results
$851,000 est. value
Terre Haute, IN 47876

FM-Fire Alarm and Mechanical Preventative Maintenance
Term Contract
Post-Bid
Less than $150,000 est. value
Indianapolis, IN 46226

Water Utility Improvements - Division A - WTP and Well Improvements
Results
Less than $2,360,000 est. value
La Crosse, IN

Mowing, Weed Control, and Landscaping
Term Contract
Post-Bid
Crawfordsville, IN

Galveston Water Improvements - Division II: Water Plant Improvements
Results
Galveston, IN 46932

Regulated Drain Periodic Maintenance, Mowing and Spraying
Term Contract
Post-Bid
Anderson, IN

2020 Wastewater Treatment Improvements
Results
Glenwood, IN

Disposal of House Hold Hazardous Waste
Term Contract
Post-Bid
South Bend, IN

Indiana Harbor and Canal Confined Disposal Facility Wastewater Treatment Plant
Results
$1,000,000 to $5,000,000 est. value
East Chicago, IN 46394

Topeka Water Treatment Plant
Renovation, Addition
Post-Bid
$200,000 est. value
Topeka, IN 46571

Martinsville WWTP Chemical Phosphorus Removal
New Construction
Results
Martinsville, IN 46151

Last Updated 05/24/2022 07:49 AM
Project Title

Wet Weather Pond Dredging Services

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN 46805   (Allen County)
Category(s) Heavy and Highway, Sewer and Water, Single Trades
Sub-Category(s) Dredging, Service/Term Contracts, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Water Treatment Plant, Addition.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents