Similar Projects
Tempe Campus Student Housing Renovations
Renovation
Conception
Tempe, AZ 85281

Tempe Campus Core Support Research Facility
New Construction
Conception
Tempe, AZ 85281

Design-Build Services
New Construction - 150,000 SF
Design
Tucson, AZ

Construction Manager at Risk Services Relating to the University of Arizona`s Andrew Weil Center for Integrative Medicine
New Construction - 34,000 SF
Design
Tucson, AZ 85721

Construction of the NATC Virtual Simulator Building/Tiny House Foundations
New Construction - 1,600 SF
Bidding
Taylor, AZ

Construction Services Job Order Contracting
New Construction
Bidding
Tucson, AZ

Capla Addition and Renovation
Renovation, Addition
Post-Bid
$1,400,000 est. value
Tucson, AZ 85721

Mcccd Phoenix College Building A Remodel
Post-Bid
Phoenix, AZ 85013

Construction Manager at Risk (CMAR) Services - Life Science / Physical Science Remodel and Building Additions - South Mountain Community College
Renovation, Addition
Results
$11,500,000 est. value
Phoenix, AZ 85040

NAU Science Annex 1st. and 2nd. Floor Renovation
Results
$5,335,406 est. value
Flagstaff, AZ 86011

Applied Research Building
New Construction - 60,000 SF
Construction
Less than $33,000,000 est. value
Phoenix, AZ

Chemistry Building Renovations
Renovation - 75,000 SF
Construction
Tucson, AZ 85721

West Campus Student Housing Academic/Office Space
New Construction
Conception
Glendale, AZ 85306

Construction Services for the O'odham Language Building
New Construction - 6,400 SF
Bidding
Sells, AZ

CMAR Services for Multiple Projects at Cavit
Term Contract
Post-Bid
Less than $4,000,000 est. value
Coolidge, AZ

Reported 01/06/2022 12:00 AM
Project Title

The Bridges, High Bay Facility

Physical Address View project details and contacts
City, State (County) Tucson, AZ   (Pima County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

A new 4,000 GSF research facility. Provide Construction Manager at Risk Services relating to the proposed new The Bridges, High Bay Facility, to be located at The University of Arizona Tech Park at The Bridges, in Tucson

Details

College/University, 4,000 SF New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents