Similar Projects
US 101/Chicken Coop Creek - Remove Fish Barrier
Infrastructure
Design
$2,472,000 CJ est. value
Cosmopolis, WA 98537

SR 105/W Harriman St Signal - Roundabout
Infrastructure
Design
$1,000,000 CJ est. value
Aberdeen, WA 98520

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

Logging Road Resurfacing
Infrastructure
Post-Bid
Montesano, WA

Greenwood Tie
Infrastructure
Post-Bid
WA

Johnson Area Roads Overlay
Infrastructure
Results
$487,238 est. value
Aberdeen, WA 99111

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

SR 105 / Washaway Beach Vicinity - Slope Protection
Infrastructure
Design
$797,000 CJ est. value
Grayland, WA 98547

Airfield Pavement Maintenance
Term Contract
Post-Bid
Hoquiam, Quincy, WA 98550

Miller Junior High School Site Preparation for Covered Area
Infrastructure
Results
Aberdeen, WA 98520

US 12/SR 8/Grays Harbor County Fish Passage Barriers-Remove Fish Barrier
Infrastructure
Design
$55,055,000 CJ est. value
McCleary, WA 98557

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Downtown Aberdeen Revitalization Traffic Improvements
Infrastructure
Results
$1,200,000 to $1,500,000 est. value
Aberdeen, WA 98520

US 12/Heron St Bridge Tier 1 - Bridge Rehabilitation
Infrastructure
Design
$1,887,000 CJ est. value
Aberdeen, WA 98520

Last Updated 09/13/2022 12:43 AM
Project Title

SR 109/N of Moclips Highway - Stabilize Slope

Physical Address View project details and contacts
City, State (County) Hoquiam, WA 98550   (Grays Harbor County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected December 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,824,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The side slope along this section of SR 109 is experiencing slope failure. This project will stabilize the slope and reduce the risk of future roadway closures. As of September 13, 2022, this project is in a Final Planning status. Preliminary engineering is expected to begin in the third quarter of 2019 and environmental design is expected to be complete in the second quarter of 2022. The contract advertisement is expected in fourth quarter of 2022 and construction is anticipated to be operationally complete in the fourth quarter of 2023. *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents