Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Electric Construction and Maintenance - Emergency Storm Restoration
Alteration
Bidding
Memphis, TN

Winchester Taxiway Yankee Bridge Electrical Damage Repair
Alteration
Bidding
Memphis, TN 38116

HVAC Installation
Post-Bid
Millington, TN 38053

Lakeland Preparatory School Audio Visual Upgrades
Post-Bid
Lakeland, TN 38002

Fogelman Executive Building Upgrades HVAC Controls
Results
Memphis, TN 38152

High Rise Interior Upgrades
Results
Memphis, TN 38105

Clement, Mitchell, and Theatre HVAC Updates
Construction
$6,440,000 est. value
Memphis, TN

Winchester TWY Y Bridge - Electrical Damage Repair
Alteration
Bidding
$300,000 est. value
Memphis, TN

Vehicle Exhaust Removal Systems
Post-Bid
Collierville, TN 38017

Bass Pro Shops at the Pyramid Facade Upgrade
Results
Memphis, TN 38105

International Center Facility Improvements
Renovation
Bidding
$500,000 est. value
Memphis, TN

Painting at Tara Oaks Elementary School
Post-Bid
Collierville, TN 38017

Winchester Elementary School HVAC Replacement
Term Contract
Results
Memphis, TN 38116

Heatlok Soy Insulation
Alteration
Bidding
Memphis, TN

Reported 05/19/2022 12:00 AM
Project Title

International Center Suite 101 Office Conversions

Physical Address View project details and contacts
City, State (County) Memphis, TN 38111   (Shelby County)
Category(s) Education, Single Trades
Sub-Category(s) College/University, Electric, Finishes/Interior, HVAC, Painting, Windows/Doors
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Demolish existing walls as indicated on the drawings. Remove the ceiling grid and existing light fixtures. Install new walls, electrical, HVAC, ceiling grid, and doors as shown on drawings. All walls and doors are to receive a primer coat and a minimum of two coats of paint. 1. Protect all remaining walls, carpet, doors, and any remaining materials from damage. 2. Walls as indicated are to be demolished and materials removed from site. Walls that are demolished shall be removed above the new ceiling grid location and secured to prevent any material from falling. 3. Remove existing ceiling grid, panels, and light fixtures. 4. Install new walls as shown on drawings. Existing wood trim is to be cut to fit the new walls. The trim should be flush with the new walls and any gaps filled prior to painting. The walls are to be finished to level four requirements and prime and paint. A minimum of two coats of paint is required. 5. Provide and install base to match existing 6. Provide and install doors as shown on drawing schedule. 7. Provide and install ceiling grid as shown on drawing. 8. Provide and install electrical and light fixtures as shown on drawing. 9. Provide and install HVAC materials as shown on drawing.

Details

College/University, Renovation.
Division 02 - Existing Conditions.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Painting.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents