Similar Projects
Godwin 4 IN. Dri-Prime HL 125M Emergency Water Pump 2021
Infrastructure
Bidding
Waterbury, CT

Primary Sludge Pump and Primary Settling Tank Mechanism Replacements
Post-Bid
Less than $350,000 est. value
Portland, CT

KSB Model KRT K 100-251/164XG Submersible Pump
Post-Bid
New Canaan, CT

John S. Roth Wellfield Improvements
Results
$1,700,000 est. value
Middletown, CT

Chemical Improvements at the North Sleeping Giant Wellfield
Results
Hamden, CT

Well Pump Installation
Infrastructure
Post-Bid
Woodbury, CT 06798

Grinder Units for Scum and Sludge Transfer Pumps
Results
Stamford, CT

USCG Replace Condensate Receiver Pump Sets
Term Contract
Post-Bid
$100,000 to $150,000 est. value
New London, CT 06320

Repair of Johnston 24PO-1 Stage Vertical Storm Water Pump 2 at Cummings Pump Station
Term Contract
Results
Stamford, CT

Well Testing and Drilling Services
Results
Less than $82,150 est. value
Mansfield Center, CT 06250

Occum Hall Fire Pump Replacement Project
Results
Windham, CT 06226

High Rise Geothermal Heat Pumps Replacement
Results
$197,800 est. value
Windham, CT 06226

Grinder Pump for Low Pressure Sewer Collection System
Results
Waterford, CT

Rehabilitation and Reconditioning of Fish Wells at Two State DEEP Hatcheries
Results
Kensington, CT

Citywide Maintenance and Repair of Various Drains and Pumps
Results
Stamford, CT

Last Updated 10/21/2021 05:16 PM
Project Title

Furnish One Nitrate Recycle Submersible Wall Pump

Physical Address View project details and contacts
City, State (County) Manchester, CT   (Hartford County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Supplier shall furnish 1 (one) submersible wall pump complete with all appurtenances, accessories and spare parts as will be required to produce a complete and workable installation. This is a spare unit to the current pumps installed at the Hockanum River Water Pollution Control Plant. Installation will be performed by Plant Personnel.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents