Similar Projects
Green Leaf Community at Childress
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Atlanta, GA 30311

FIFTY Tower
New Construction, Infrastructure
Design
$450,000,000 CJ est. value
Atlanta, GA 30308

First United Methodist Church Mixed-use Development
Demolition, New Construction, Infrastructure, Build-out, Renovation
Design
$50,000,000 CJ est. value
Atlanta, GA 30308

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Physical Activity Center Expansion
Addition, Demolition, Renovation, Infrastructure - 4,987 SF
Post-Bid
$5,000,000 CJ est. value
Roswell, GA 30075

Contract For Replacement Of 2-Inch And 4-Inch Water Mains
Alteration
Post-Bid
East Point, GA

Stacks Road over CSX Railroad - Abutment Wall Repairs and Roadway Drainage Improvements
Results
College Park, GA 30349

T32-D7-PCC-District Wide-122083
Infrastructure
Results

Center for Advanced Surgical Services (CASS)
New Construction, Infrastructure - 556,000 SF
Construction
$180,600,000 CJ est. value
Atlanta, GA 30303

Medlock Shops / Johns Creek
New Construction, Infrastructure - 6,200 SF
Construction
$1,600,000 CJ est. value
Johns Creek, GA 30097

Hotel at Southern Post / Roswell
Demolition, New Construction, Infrastructure - 153,137 SF
Pending Verification
$20,000,000 CJ est. value
Roswell, GA 30075

Hotel at Southern Post / Roswell
Demolition, New Construction, Infrastructure - 153,137 SF
Pending Verification
$20,000,000 CJ est. value
Roswell, GA 30075

The Proctor
New Construction, Infrastructure - 142,000 SF
Design
$55,000,000 CJ est. value
Atlanta, GA 30318

Riverside Drive Stormwater Mitigation Project
Infrastructure
Bidding
$558,237 CJ est. value
Sandy Springs, GA 30328

Last Updated 03/09/2023 11:03 PM
Project Title

Oakley Road Resurfacing and Sidewalk Project

Physical Address View project details and contacts
City, State (County) Union City, GA 30291   (Fulton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $1,477,758 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project/contract consists of sidewalk construction with a landscape strip, storm structures and resurfacing of Oakley Rd. 91347 Construction, Sidewalk and Driveway, Including Pedestrian and Handicap Ramps 91357 Construction, Vaulted Sidewalk 91382 Maintenance and Repair, Sidewalk and Driveway, Including Removal 91394 Paving and Resurfacing, Alley and Parking Lot 91395 Paving and Resurfacing, Highway and Road 91396 Paving and Resurfacing, Streets, Major and Residential

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents