Similar Projects
Z2NE--Upgrade Facility Water - Smith Hafeli Inc - MA VA Medical Center
Post-Bid
Marion, IL

183 CES Replace Metal Fascia P-36
Post-Bid
Less than $25,000 est. value
Springfield, IL 62707

Elevated Water Storage Tank
Results
Gardner, IL 60424

Elevated Tank Improvements
Results
Pecatonica, IL 61063

Water Tower Cleaning
Term Contract
Post-Bid
Oswego, IL 60543

Terminal Expansion - Phase 4 Signage
Renovation
Results
Rockford, IL 61109

Roofing Systems, Exterior Building Maintenance
Term Contract
Post-Bid

2020 Water Pumping Station Exterior Facade Restoration
Results
$84,000 est. value
Homewood, IL 60430

Base of Stairwell Repair at Prosser High School
Post-Bid
Chicago, IL 60602

State Street And Seven Hills Elevated Water Storage Tanks Rehabilitation
Renovation
Results
O'Fallon, IL 62269

Water Tower Cleaning
Post-Bid
Colona, IL

Maywood Fine Arts Exterior Remodeling
Results
Maywood, IL 60153

New 250,000 Gallon Elevated Water Storage Tank
Post-Bid
Less than $1,310,000 est. value
Carrollton, IL

Repair/Replacement Overhead Door Headers, Replce Siding, Update Exhaust System and Wash Bays
Results
Springfield, IL 62706

Fire Station No. 2 Exterior Improvements And Roof Replacement
Renovation
Results
Springfield, IL 62701

Reported 05/26/2021 12:00 AM
Project Title

Gallon Double Ellipse (Division Street) Exterior Overcoat, Mixer Installation, and Misc. Repairs

Physical Address View project details and contacts
City, State (County) Mundelein, IL 60060   (Lake County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Finishes/Exterior, Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Tank Information: The structure is a 500,000 gallon double ellipse elevated water storage tank with a low-water level of 111 feet 1 inch The work includes: Exterior: High pressure water clean (5,000 to 10,000 psi), spot power tool clean to a SSPCSP11 standard, and apply a three (3) coat epoxy urethane system. Pit Piping: Abrasive blast clean to a SSPC-SP6 commercial standard and apply a two (2) coat epoxy system. Foundation: Repair spalls. Water clean and apply a two (2) coat epoxy system to the concrete. Note that the foundation coating is to be black (both coats can be black). Mixer: Install a mechanical mixer. Repairs: 1) Replace the wet interior roof hatch. 2) Install a riser grate. 3) Overflow discharge modification. 4) Install a wet interior ladder. 5) Install a roof platform. 6) Install bowl rigging couplings. 7) Replace aviation light bulbs. 8) Balcony drain holes. 9) Balcony access modification.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 09 - Finishes, Painting.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents