Similar Projects
The Pointe at 53rd
New Construction
Conception
Murray, UT 84107

Sage Valley Apartments Phase 2
New Construction
Conception
West Valley City, UT

370 Millennium Tower
New Construction - 284,500 SF
Design
Salt Lake City, UT 84111

Cottonwood Mall Redevelopment
New Construction
Design
Holladay, UT 84117

Tradition Point Apartments
New Construction
Bidding
Murray, UT 84107

The Lofts At River's Edge
New Construction - 9,087 SF
Sub-Bidding
$1,000,000 to $5,000,000 CJ est. value
Provo, UT 84604

Ridgeline Parkway Community
New Construction - 5,184,000 SF
Post-Bid
$10,000,000 CJ est. value
Spanish Fork, UT 84663

Alta Depot
New Construction - 434,303 SF
Post-Bid
$10,000,000 CJ est. value
Salt Lake City, UT 84102

DFCM Construction- UU Auxiliary Svcs West Village Family/Graduate Housing-22011750-VBS DB Stg II
New Construction - 442,000 SF
Results
$109,525,000 est. value
Salt Lake City, UT 84108

DFCM Construction - VBS CX Services - UU West Village Family and Graduate Housing
New Construction, Alteration - 442,000 SF
Results
$109,525,000 est. value
Salt Lake City, UT

85 North Apartments
New Construction - 95,289 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Provo, UT 84606

Liberty Sky Residential Tower
New Construction
Construction
$90,000,000 est. value
Salt Lake City, UT 84111

Bach Apartments
New Construction
Pending Verification
American Fork, UT

Northshore Neighborhood
New Construction
Pending Verification
Saratoga Springs, UT

Transit Area Mixed Use
New Construction
Conception
Salt Lake City, UT 84111

Reported 01/07/2022 11:00 AM
Project Title

Park Place Apartments

Physical Address View project details and contacts
City, State (County) Farmington, UT 84025   (Davis County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method
Project Status Obtained from a Public Office
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

2 Apartments/Condominiums, 3 Stories Above Grade, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents