Similar Projects
Waterford Montessori Academy - Request for Proposals: HVAC Improvements
Renovation
Post-Bid
Waterford Township, MI 48329

Maloney Manor RoofTop Make-Up Air Modernization
Alteration
Post-Bid
Bay City, MI 48708

Fume Hood Filters Replacement
Results
Ann Arbor, MI 48105

Memorial Library HVAC Improvements
Results
Eastpointe, MI 48021

CBS HVAC Upgrade
Alteration
Post-Bid
Bay City, MI

CDBG Emergency Furnace Replacement
Results
Taylor, MI 48180

Air Filters for Powerhouse
Term Contract
Post-Bid
Dearborn, MI

A/C Unit and Installation
Results
Novi, MI 48377

A/C in the Middle School
Alteration
Post-Bid
Harper Woods, MI

District HVAC Filters
Term Contract
Results
Sterling Heights, Warren, MI 48093

MBMV 162418 Modernize DDC System
Term Contract
Post-Bid
Battle Creek, MI 49015

Installation of Needlepoint Ionization Units
Alteration
Results
Lincoln, MI 48742

University Hospital - UH AC Unit ISO-Dampers
Alteration
Post-Bid
Ann Arbor, MI

HVAC Controls Systems
Alteration
Results
Lansing, MI

Energy Savings Performance Contract
Alteration
Post-Bid
Jonesville, MI 49250

Last Updated 01/03/2023 03:05 PM
Project Title

Proposal A- Kearsley High School Boiler Replacement

Physical Address View project details and contacts
City, State (County) Flint, MI 48506   (Genesee County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $570,000 [brand] Estimate
Plans Available from Architect - 10/27/22
Owner View project details and contacts
Architect View project details and contacts
Description

Sealed Envelope must include 2 copies of the completed Form of Proposal (section 00 4000) and a Bid Bond or certified check in the amount of 5% of the bid (for Bids over $50,000). Any questions should be directed to the Architect's office. A bid bond executed by a U.S. Treasury Listed Surety Company in favor of the Owner or a cashier's check in the amount of at least five percent (5%) of the base bid payable to Kearsley Community Schools shall be submitted with each proposal. This bid bond shall accompany each proposal. Successful bidder will be required to furnish and pay for satisfactory Performance and Payment Bonds. Bid questions should be directed to the Architect by email to pamc@frenchaia.com. The deadline for bid questions is 5:00 pm on Friday, November 18, 2022. All bidders must provide familial disclosure in compliance with MCL 380.1267 (P.A. 232 of 2004) and attach this information to the bid. The bids shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the owner or any employee of the bidder and any member of the board of education or the superintendent of Kearsley Community Schools. The Owner will not accept a bid that does not include this sworn and notarized disclosure statement. The Owner reserves the right to award the Contract to other than the low bidder, accept or reject any or all bids, in whole or in part, waive any informalities, accept any bid when, in the opinion of the Owner such action will serve the best interests of the Kearsley Community School District. All bids shall be held open and irrevocable for a period of sixty (60) days from the Due Date.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents