Similar Projects
8-Inch and 12-Inch Ductile Iron Water Main Replacement
Infrastructure
Bidding
$7,500,000 to $9,000,000 est. value
San Francisco, CA

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Bidding
Santa Clara, CA

Renovation of the Existing Underground Steam Distribution System
Infrastructure
Post-Bid
$13,222,600 est. value
Yountville, CA 94599

Z1da--Service-Renovate Domestic Water Piping Projects FMS
Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value
Loma Linda, CA

Hydronic Valve Replacement
Infrastructure
Results
Channel Islands Beach, CA

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

Locating Subsurface Facilities
Alteration
Bidding
Riverside, CA 92519

Professional Engineering Services For Water System Improvements In Madera County Maintenance District No. 36 Eastin Arcola
Infrastructure
Post-Bid
Madera, CA

3rd Street, Buena Mesa Drive, and Calimesa Boulevard 24" Recycled Water Pipeline
Infrastructure
Results
$4,000,000 to $6,000,000 est. value
Calimesa, Yucaipa, CA 92399

Recycled Air/Vac & Drain Replacement Project
Alteration
Bidding
$50,000 est. value
Fallbrook, CA 92028

Water System Repair
Alteration
Post-Bid
Placerville, CA 95667

Los Nietos, Line D, Sorensen Lateral
Infrastructure
Results
$500,000 to $775,000 est. value
Los Nietos, CA 90610

Groundwater Pre-Filter and Carbon Filtration Removal and Replacement and Repair Services
Term Contract
Bidding
Paramount, South Gate, CA 90280

Water Leak Repair-Richmond
Alteration
Results
$400,000 est. value
Richmond, CA 94804

North Texas Street Water Main Replacement and Overlay East Travis Boulevard to Air Base Parkway
Infrastructure
Bidding
$7,098,000 est. value
Fairfield, CA 94533

Last Updated 09/30/2021 03:41 PM
Project Title

47--Deva-Backflow Project Pipe & Fittings

Physical Address View project details and contacts
City, State (County) Death Valley, CA   (Inyo County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Death Valley National Park will install new backflow devices and backflow setters in the Stovepipe Wells and Furnace Creek Water Systems. Death Valley National Park will be installing previously purchased Zurn Model 475ST Assemblies and previously purchased Zurn 400ST Model MJFSST Valve Setters. The items listed in Attachment 1 include the pipe, fittings, and appurtenances needed to install these backflow devices and setters. The backflows to be installed include one (1) device, one (1) device, one (1) device, and one (1) device. The backflow is to be installed as a redundant parallel unit to allow for the existing unit to be serviced without cutting service to customers.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents