Similar Projects
Blue Heron Mine 18 Sanitary - New Onsite Wastewater Disposal System
Alteration
Design
Oneida, TN 37841

Blue Heron Mine 18 Sanitary - New Onsite Wastewater Disposal System
Alteration
Design
Oneida, TN 37841

Phase 1 Sewer Rehabilitation Group 2 CIPP
Infrastructure
Bidding
Memphis, TN

Sewer Main Extension
Infrastructure
Bidding
Cleveland, TN

East Ridge Basin 1-75 Collector Sewer Project
Post-Bid
Chattanooga, TN 37402

Rehabilitation of a Storm Drain Pipe
Post-Bid
Signal Mountain, TN

Manhole Components
Term Contract
Results
Less than $100,000 est. value
Chattanooga, TN

Storm Drain Replacement at Glengerrie Drive
Results
Less than $14,025 est. value
Lakesite, TN

Sprinkler System
Renovation
Construction
Clarksville, TN 37040

Galvanized Currogated Pipe
Term Contract
Bidding
Nashville, TN

CDBG 2019 Wastewater Collection Improvements
Post-Bid
Rockwood, TN

East Ridge Sewer Basin 3C and 4B Rehabilitation
Results
Chattanooga, TN

Basin B2E Sanitary Sewer Rehabilitation Project
Infrastructure
Bidding
Johnson City, TN

Moccasin Bend WWTP Equalization Basin And Blower Replacement Improvements
Post-Bid
Chattanooga, TN 37405

2020 Red Bank Sewer Rehabilitation
Results
Red Bank, TN

Last Updated 12/07/2021 10:50 AM
Project Title

Wastewater System Improvements - Collection System Rehabilitation

Physical Address View project details and contacts
City, State (County) Mountain City, TN   (Johnson County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work is in one Contract and includes the rehabilitation of approximately 11,000 feet of sewer, installation of sewer flow monitoring equipment and all miscellaneous items and all work as shown on the project plans and within the project specifications.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents