Similar Projects
Pleasant Street Subdivision
New Construction
Conception
Brockton, MA 02301

Residences at Atlantic Country Club and Inclusionary Housing
New Construction, Infrastructure
Conception
$21,877,600 CJ est. value
Plymouth, MA 02360

Keenes Mill Village
New Construction, Infrastructure
Design
$11,000,000 CJ est. value
Duxbury, MA 02332

Sandwich Road/Duplex - Megryco
New Construction, Infrastructure
Design
Plymouth, MA 02360

Elm Street/Jones River Stormwater Improvements
Infrastructure
Bidding
$610,000 CJ est. value
Kingston, MA 02364

Elm Street/Jones River Stormwater Improvements
Infrastructure
Bidding
$610,000 CJ est. value
Kingston, MA 02364

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

11-15 Frederick Douglas Avenue Backflow Installation
Infrastructure
Post-Bid
Brockton, MA 02301

Water Transmission Main Valve Replacement, Phase 2
Infrastructure
Results
$1,000,000 est. value
Brockton, MA

2021 Water Main Improvements for Thomas Street, Thomas Circle and Morse Avenue
Infrastructure
Results
$1,600,000 est. value
Brockton, MA

Middleborough Park Department - Basketball Court Re-Paving
Infrastructure
Construction
$150,000 CJ est. value
Middleborough, MA 02346

Main Street Battery Storage Warehouse
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Carver, MA 02330

Sargents Way Commercial Building
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Brockton, MA 02301

Elliot Street Multi-Residential Development
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
Brockton, MA 02302

Greenbush MBTA Parking
Infrastructure
Bidding
$490,364 CJ est. value
Scituate, MA 02066

Last Updated 01/25/2023 03:06 PM
Project Title

Sewer System Rehabilitation Project 2022

Physical Address View project details and contacts
City, State (County) Rockland, MA 02370   (Plymouth County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $260,260 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes approximately: Cleaning, inspecting, testing, and sealing 10,258 lf of sewers; installing 40 lf of structural cured-in-place short liner; installing 771 lf of structural cured-in-place; cementitious lining of 326 vf of sewer manholes; and testing and grouting 68 service connections. The scope of work includes construction of approximately: Cleaning, inspecting, testing, and sealing 10,258 lf of sewers; installing 40 lf of structural curedin-place short liner; installing 771 lf of structural cured-in-place; cementitious lining of 326 vf of sewer manholes; and testing and grouting 68 service connections. The required contract completion period is 140 consecutive days, exclusive of re-test inspection. Bid Security in the form of a bid bond, cash, certified check, treasurer's or cashier's check payable to the Owner, isrequired in the amount of five percent of the bid, in accordance with Section 00200, INSTRUCTIONS TO BIDDERS. The Instructions to Bidders, Form of General Bid, Agreement, Plans, Specifications, Performance and Payment Bond, and The selected contractor shall furnish a performance bond and a payment bond in amount at least equal to one hundred percent (100%) of the contract price as stipulated in Section 00700 GENERALCONDITIONS of these specifications. All bids for this project are subject to applicable bidding laws of Massachusetts, including General Laws Chapter 30, Section 39M as amended. For addition to the project plan holder's list to guarantee receipt of addenda, it is recommended interested bidders obtain the Contract Documents directly from Accent. Interested bidders will be prompted to register an email address with Accent to access the documents. Prevailing Wage Rates as determined by the Director of the Executive Office of Labor and Workforce Development under the provisions of the Massachusetts General Laws Chapter 149, Section 26 to 27H, as amended, apply to this project. It isthe responsibility oftheBidder, before bid opening, to request if necessary, any additional information on Prevailing Wage Rates for those trades people who may be employed for the proposed work under this contract Prospective bidders shall not open sewer manholes in the Town prior to notifying the Engineer. Requests to open sewer manholes shall be submitted to the Engineer via email to Mahoney.Carolyn@wseinc.com. By submission of a bid, the Bidder agreesthat this bid shall be good and may not be withdrawn for a period of 30 days, Saturdays, Sundays and legal holidays excluded after the opening of bids. The Owner reserves the right to waive any informalities in bids and to reject any or all bids.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents