Similar Projects
NOI- Brand Name or Equal- Andover HVAC Controls
Renovation
Design
$100,000 CJ est. value
Loma Linda, CA 92354

RFP Design - High School Gymnasium HVAC Project
Renovation
Bidding
$2,000,000 CJ est. value
Redlands, CA 92374

Hvac Replacement at Multiple Sites
Renovation
Sub-Bidding
$1,420,812 CJ est. value
Fontana, CA 92335

HVAC Services
Term Contract
Sub-Bidding
Rialto, CA 92376

Cooling Tower Motor Replacement
Infrastructure
Post-Bid
Loma Linda, CA 92357

HVAC Maintenance
Term Contract
Post-Bid
Nipton, CA 92364

AVUSD: HVAC Replacement at Five Various Sites - Phase 2 Project
Alteration
Results
$500,000 est. value
Apple Valley, CA

California Institution for Men Air Cooling, Facility A
Renovation
Results
$11,108,918 CJ est. value
Chino, CA 91710

Grace Yokley Middle School Locker Room HVAC Addition
Alteration
Post-Bid
$200,000 est. value
Ontario, CA 91761

Alta Loma High School Central Plant Chiller Replacement
Renovation
Results
$936,237 CJ est. value
Rancho Cucamonga, CA 91701

Recreation Center HVAC
Alteration
Post-Bid
Needles, CA 92363

Civic Center HVAC Plant Replacement Project
Renovation
Results
$1,926,000 CJ est. value
Rancho Cucamonga, CA 91730

General Services Air Conditioning Installation
Term Contract
Post-Bid
$400,000 est. value
Highland, CA 92346

BL 10 Cooling Tower Replacement
Renovation
Results
$1,088,248 CJ est. value
Yucaipa, CA 92399

HVAC Units
Term Contract
Post-Bid
Rialto, CA

Last Updated 07/25/2023 10:18 AM
Project Title

Greenhouse HVAC Equip And DDC Controls

Physical Address View project details and contacts
City, State (County) San Bernardino, CA 92407   (San Bernardino County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $4,400 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 25,2023, this project has not yet been awarded. A timeline for award has not yet been established. Online Q&A Yes Q&A Deadline 06/14/2023 2:00 PM (PDT) In general, the scope of work includes providing all labor, materials, equipment, permits, and transportation for the Greenhouse HVAC Equipment & DDC Controls Furnish and Install Project, on the campus of California State University, San Bernardino. Work consists of replacement of two (2) existing chilled water fan coils, installation of new spiral sheet metal ductwork with registers for continuous airflow. Replace four (4) existing evaporative coolers, two (2) evaporative coolers will be relocated and ductwork to be extended to all four coolers. Addition of Distech Controls to control coolers, fan coils, chilled water pump systems, space heaters, and circulation fans.. Work shall be completed in a timely and safe environment in accordance with the detailed specifications and special conditions. Construction period shall be one hundred fifty (150) calendar days from the date of the Notice to Proceed with a proposed work schedule of August 1, 2023 - December 31, 2023. The estimated budget for this project is limited to $125,000.00. Scope of Work Objective: To replace 2 existing Chilled Water Fan coils and install new Spiral sheet metal ductwork with registers for continuous airflow. Replace 4 existing evaporative coolers, 2 evaporative coolers will be relocated to the opposite side of the greenhouse and extend duct work on all 4 evaporative coolers. Add Distech Controls M # ECY-CSC and ECB-PTU (See Below) to control All Evaporative coolers, Fan coils, chilled water pump systems, space heaters, and circulation fans to maintain temperature and humidity, Scope of Work: o Contractor to replace 4 Evaporative Coolers and extend duct work with registers (See attached Drawing). o Contractor to add Reverse Osmosis to serve all evaporative coolers. Two systems, each system will serve two evaporative coolers. Reverse Osmosis Systems will be mounted as indicated on the drawing by the mech contractor. o Contractor to replace 2 Chilled Water Fan coils, each fan coil will be the same tonnage M# 40RMS016 including control valves and extend ductwork with registers, Duct work shall be suspended by Unistrut stand, and under no circumstance will the ductwork be supported by the greenhouse structure. (See attached drawing) o Contractor shall replace return air Plenums and reinstall opposed blade dampers, should fan Coil #1 be replaced contractor shall provide a new opposed blade damper assembly. o Contractor shall provide a new concrete equipment pad with a dimension no less than 102" x 42" x 5" for Fan Coil 1 should the fan coil be replaced. o All existing chilled water piping in greenhouses is to be covered with .030" PVC covering. (White) Chilled Water Pump & Building Chilled water valve to be reinsulated and covered with Aluminum jacketing .030", Point up all open seams on exterior insulation and make watertight. o New 1 1/2 " Insulation will be required from the isolation ball valve at each fan Coil. covered with .030" PVC covering. o Contractor shall install new glass panes where existing evaporative cooler E2-E3 originally resided. The old glass if correct size may be reinstalled. o Contractor shall replace existing controls with Distech Brand and integrate into the Campus N4 web supervisor with Graphics, Control Logic shall consist of: maintaining temperature, humidity, Start/Stop, Alarm Reporting, Trend data, scheduling, and graphical interface with end-user access so changes can be made from the users of the greenhouse. Submittal Package & Shop Drawings will be required and approved prior to the commencement of work

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents