Similar Projects
New High School
New Construction
Conception
$165,000,000 est. value
TX

New Elementary School
New Construction
Conception
$28,000,000 est. value
Wolfforth, TX 79382

Godley High School Fine Arts Addition
Addition
Design
Godley, TX 76044

Godley High School Career Center
Addition
Design
Godley, TX 76044

LP and L McDonald Substation Construction Services
New Construction, Infrastructure
Bidding
$700,000 CJ est. value
Lubbock, TX 79416

LP and L Ductile Poles
Infrastructure
Bidding
$150,000 CJ est. value
Lubbock, TX 79401

Frenship Independent School District - New High School
New Construction, Infrastructure
Sub-Bidding
$50,000,000 CJ est. value
Lubbock, TX 79407

Frenship Independent School District - New High School
New Construction, Infrastructure
Sub-Bidding
$50,000,000 CJ est. value
Lubbock, TX 79407

Harmony Science Academy Lubbock - Relocation
Renovation - 67,000 SF
Post-Bid
Less than $5,000,000 est. value
Lubbock, TX 79407

Lubbock Cooper ISD High School Addition And Renovation
Renovation, Addition - 64,000 SF
Post-Bid
Lubbock, TX 79423

Pre-Construction Services for New Godley Elementary School 3 and Godley High School Phase 2
New Construction
Results
Less than $80,000,000 est. value
Godley, TX 76044

Pre-Construction Services for New Godley Elementary School 3 and Godley High School Phase 2
New Construction
Results
Less than $80,000,000 est. value
Godley, TX 76044

CMAR Services for Midway ISD New Elementary School
New Construction - 102,000 SF
Construction
Less than $27,500,000 est. value
Midway, TX 76712

A D Wheat Middle School Additions and Renovations
Renovation, Addition
Construction
$38,400,000 est. value
Cleburne, TX 76033

Oakridge Leasing Office New Building
Demolition, New Construction, Infrastructure - 2,112 SF
Pending Verification
$400,000 CJ est. value
Lubbock, TX 79424

Last Updated 08/22/2022 03:03 AM
Project Title

RFP Construction Manager at Risk - Additions to Godley High School Phase 3, R.B. Godley Elementary, and Legacy Elementary

Physical Address View project details and contacts
City, State (County) Godley, TX 76044   (Johnson County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Site Development
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $25,735,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Request for Proposals (RFP) for Construction Manager at Risk (One-Step Process) Godley High School Phase 3: $18,486,600; R.B. Godley Elementary: $6,172,000; Legacy Elementary School: $1,077,00

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents