Similar Projects
Last Updated | 03/24/2023 12:14 PM |
Project Title | Henefer Upper Pipeline Project |
Physical Address | View project details and contacts |
City, State (County) | Henefer, UT 84033 (Summit County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,695,000 [brand] Estimate |
Plans Available from | Civil Engineer - 02/21/23 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Henefer Town (Owner) is requesting Bids for the construction of the Henefer Upper Pipeline Project. Bidding Documents may be downloaded from the designated website. Prospective Bidders are urged to register with the designated website as a plan holder, even if Bidding Documents are obtained from a plan room or source other than the designated website in either electronic or paper format. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. The Owner reserves the right to waive any informality or to reject any or all Bids. Each Bidder must deposit with his Bid, a bid security subject to the conditions provided in the Instructions to Bidders. No Bidder may withdraw his Bid within thirty-five (35) days after the date of the opening thereof. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Henefer Town is an Equal Opportunity Employer. The Project is expected to be substantially complete by April 1, 2024. The Project includes the following Work: o 26,550 feet of fused HDPE pipe ranging from 20", 18, and 14" installed by open trench o 20 Lateral and turnout connections o Air valve and drain assemblies |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |