Similar Projects
Blueberry Hill Road A-007 - 24317 - Taos County
Infrastructure
Conception
$7,888,000 CJ est. value
El Prado, NM 87529

Electric Vehicle Charging Station
New Construction, Infrastructure
Conception
$200,000 CJ est. value
Red River, NM 87558

Livestock Well and Watering System
Infrastructure
Design
$160,000 CJ est. value
Ojo Caliente, NM 87549

Livestock Well and Watering System
Infrastructure
Design
$160,000 CJ est. value
Ojo Caliente, NM 87549

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Rodarte MDWCA Water System Improvements Project
New Construction, Infrastructure
Bidding
$537,000 CJ est. value
Penasco, NM 87553

RFQ Contractor - El Vado Dam Spillways and Dam Crest Modification Project
Infrastructure
Post-Bid
$86,000,000 CJ est. value
Tierra Amarilla, NM 87575

Lower Arroyo Hondo MDWCA Water System Improvements Project
Infrastructure
Post-Bid
$500,000 est. value
Arroyo Hondo, NM

Y--NM-Valle De Oro NWR-Water Control Wetland 1 & 2 On
Term Contract
Results
Albuquerque, NM 87105

Las Acequias de Las Trampas Diversion Structure Replacement Project
Infrastructure
Results
$176,241 CJ est. value
Trampas, NM 87521

New Terminal - Taos Regional Airport - Town of Taos
New Construction, Infrastructure
Pending Verification
$5,400,000 CJ est. value
El Prado, NM 87529

Electric Vehicle Charging Station
New Construction, Infrastructure
Pending Verification
$200,000 CJ est. value
Questa, NM 87556

Taos Plaza Electric Vehicle Charging Stations
New Construction, Infrastructure
Conception
$400,000 CJ est. value
Taos, NM 87571

Installation of Livestock Well, Livestock Pipeline, Drinking Troughs, Storage Tank and Solar Pumping Plant
Infrastructure
Design
$300,000 CJ est. value
Ojo Caliente, NM 87549

Taos Regional Landfill Construction of Cell 4B
Infrastructure
Bidding
$2,000,000 CJ est. value
El Prado, NM 87529

Last Updated 03/17/2023 03:06 AM
Project Title

Carson National Forest Drinking Water Well Drilling Project

Physical Address View project details and contacts
City, State (County) Taos, NM 87571   (Taos County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Piedmont Environmental Sciences, Inc, 104 Bigbee Trail, Morrisville, NC 27560-9102 in the amount of $112,890.75 Only the Base Line Items have been accepted for a Total Price $112,890.75 Title: Construction - Carson National Forest Drinking Water Well Drilling Project Description of Work. The Carson National Forest is seeking to drill a new potable water well, install a new submersible pump, plug an existing well, install new water supply lines, electrical, and security fence at the Canon Administrative Site in Taos, NM All work shall be completed in accordance with the project specifications. The project includes all labor, materials, and equipment necessary to perform all the operations for the work specified. Location: Carson National Forest 604 Piedmont Drive Taos, NM 87571 Basis for Award The Government anticipates awarding a Firm Fixed-Prices contract using RFQ Best Value - Lowest Price Technically Acceptable (LPTA). Organized Site Visit (Optional) Date: January 19, 2023 Time: 1:00 pm MST Location: Carson National Forest 604 Piedmont Drive Taos, NM 87571 Magnitude of project is between $25,000 and $100,000 This project is a 100% Small Business Set-Aside. Million. The small business size standard for NAICS 237110 $39.5 Million. Davis-Bacon wages apply. Payment and Performance bonds are required. The Period of Performance (POP) shall be governed by a desired completion date of March 31, 2023. The Contractor shall begin performance 10 calendar days and complete it within 30 calendar days after receiving the Notice to Proceed. Contact: Michelle Bahr Contract Specialist (928) 333-6278 michelle.l.bahr@usda.gov Send questions to michelle.l.bahr@usda.gov no later than January 31, 2023 The solicitation package, plans, and specifications will be made available on or before January 17, and will be posted at https://beta.sam.gov/ In order to be eligible for award of a Federal Contract, potential vendors need to already be registered in the System for Award Management (SAM) www.sam.gov Offer Submissions: Offerors shall submit the Return Packet with the required information SF1442, Section B and K (business proposal) and Section M (technical proposal) of the solicitation. Offers or responses to the solicitation (include the solicitation number in the name of the document) may be sent to the Contracting officer by email: michelle.l.bahr@usda.gov before the deadline. The Deadline for receipt of responses to the RFQ shall be February 16, 2023 @ 13:00 MT (Arizona) Question Deadline 01/31/2023 Send questions to michelle.l.bahr@usda.gov *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents