Last Updated | 07/03/2023 04:32 PM |
Project Title | Perimeter Drive Widening - Holt Road to Commerce Parkway - ET523 - City of Dublin |
Physical Address | View project details and contacts |
City, State (County) | Dublin, OH 43017 (Franklin County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Construction start expected June 2025 |
Bids Due | View project details and contacts |
Estimated Value | $5,240,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project widens approximately 3,300 linear feet of Perimeter Drive from Holt Road to Commerce Parkway from an existing three lanes to four to five lanes to address increased traffic volume, delay, and reduced safety on Perimeter Drive. This improvement supports the commercial corridor along Perimeter Drive. Utilities are already buried along Perimeter Drive. The proposed right-of-way width is 100 feet. There is approximately 90 feet already in place. An additional 10 feet along the north side of Perimeter Drive will be required when the project advances. Right-of-way acquisition is funded in 2023. Utility relocation and construction is reflected beyond the five-year program period. This project will be funded through service payment revenue received from the Perimeter Center TIF. As of July 3, 2023, this project is currently in the FY 2022-2026 CIP. Information regarding a design team and the contractor selection has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to beyond the current fiscal year. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |