Similar Projects
ASB HVAC Unit Replacements
Renovation
Sub-Bidding
$200,000 CJ est. value
Ewing, NJ 08618

Robbins Elementary School HVAC Improvements
Alteration
Post-Bid
Trenton, NJ 08609

HVAC Maintenance at Trenton Water Works Distribution Complex
Term Contract
Post-Bid
Trenton, NJ 08638

Preventative Maintenance and Repair Services for Air Conditioning System
Alteration
Results
Trenton, NJ 08619

Green Hall HVAC Upgrades Project
Alteration
Results
Ewing, Ewing Township, NJ 08638

HVAC - All Regions
Term Contract
Post-Bid

Duct Cleaning
Term Contract
Results
NJ

Preventive Maintenance and Repair of HVAC Systems
Term Contract
Post-Bid
Trenton, NJ

Princeton High School (PHS) Cooling Towers Overhaul
Infrastructure
Results
$250,000 est. value
Princeton, NJ 08540

HVAC Repair and Equipment Replacement Services
Alteration
Post-Bid
$71,000 est. value
Hamilton Township, NJ

Mechanical Roof Top Unit Replacements for the Regional Day School
Alteration
Results
$680,000 est. value
Hamilton Township, NJ 08690

HVAC Repairs and Maintenance
Alteration
Post-Bid
Hamilton Township, NJ

Purchase and Installation of a Source Capture Exhaust Extraction System for All Front-line Apparatus
Renovation
Results
$215,000 CJ est. value
Ewing, NJ 08618

HVAC System Assessment Project
Alteration
Post-Bid
Trenton, NJ

Mechanical Upgrades at Multiple Schools
Renovation
Results
$1,645,000 CJ est. value
Hamilton, NJ 08619

Last Updated 07/11/2023 02:34 PM
Project Title

Powerhouse BAC Cooling Tower Repairs 2nd Rebid

Physical Address View project details and contacts
City, State (County) Ewing, NJ 08628   (Mercer County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Question Cut Off Date (Refer to Bid Section # 2 for more information.) 06/27/2023 4:00 PM Bidders are required to comply with the requirements of P.L. 1975 c. 127 (N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27 - Affirmative Action); the New Jersey Prevailing Wage Act, N.J.S.A. 34:11-56.25 et seq.; N.J.S.A. 52:25-24.2, "Statement of Ownership Disclosure"; the Public Works Contractor Registration Act (N.J.S.A. 34:11-56.48 et seq.); the New Jersey Business Registration of Public Contractors provisions (N.J.S.A. 52:32-44); Executive Order 117 and P.L. 2005 Chapter 51 (N.J.S.A. 19:44a-1 et seq.) and all amendments thereto A bid bond is required in the amount of 10% of the total bid. Bid bond shall consist of a certified check or cashiers check to the order of The College of New Jersey, or an individual or annual bid bond issued by an insurance company or surety company authorized to do business in the State of New Jersey. The successful Bidder(s) is required to provide a Performance and Payment Bond equal to 100% of the contract. A Surety Disclosure Statement and Certification form must accompany the performance bond. The College will award the contract to the lowest responsible bidder who satisfies the qualification criteria as set forth in the contract documents. Should any questions be received, a notice will be placed in the newspaper and the addendum or clarification will be available on June 29, 2023 on the College's website at https://bids.tcnj.edu/. If an addendum and/or clarification is posted, it SHOULD be noted in the General Agreement section of the bidder's proposal. Failure to do so may subject Bidder to disqualification clarification must be received prior to 4:00 p.m. on June 27, 2023 The College of New Jersey reserves the right to reject all bids or to waive any minor informalities in the bidding in accordance with law. No bid shall be withdrawn for a period of sixty (60) days subsequent to the opening of bids without the consent of The College of New Jersey. THE SCOPE OF WORK INCLUDES: A. This scope is to repair the Powerhouse BAC Cooling Tower and replacement of the existing fill media for the Facilities Department. B. See Specifications and Drawings for Details (included in Bid package). C. The College may issue Addenda or Clarifications which may include additions to or deletions from the scope of work; changes to the Specifications, Drawings, and proposal form; and clarifications of requirements. Bidder is advised to review all Addenda and/or clarifications carefully, and shall note the receipt of same with their bid package.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents