Last Updated | 05/15/2020 07:37 AM |
Project Title | Water System Improvements Carnuel Waterline Phase 2C |
Physical Address | View project details and contacts |
City, State (County) | Albuquerque, NM 87103 (Bernalillo County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $638,529 |
Plans Available from | Consultant |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project has been prepared with a 2-part base bid and three bid alternates. The base bid consists of the installation of approximately 255 LF of 12" and 130 LF of 6" Water Transmission and Distribution pipeline along NM 333 including a 120-foot Jack and Bore under NM 333. Part A consists of various items to complete a previous phase, including hydrostatic testing. Appurtenances in both parts include valves, fire hydrants, water meters, and connection(s) to existing water transmission pipeline. Rock excavation may be required in the project area. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |