Similar Projects
Fiscal Year 2021 Dodge County T-Splost Part 1
Infrastructure
Results
GA

Richland Creek Reservoir Entrance
Results
Less than $289,298 est. value
Cartersville, GA 30120

1.443 Miles of Widening and Reconstruction for Additional Turn Lanes on SR 40 Beginning West of Grove Blvd (CS 481) and Extending East to Truss Plant Rd (PR 718)
Results

T-32 Landscape Maintenance District 2 Right Of Way
Post-Bid

Dodge State Prison Drainage Improvements Phase 2
Infrastructure
Results
Chester, GA 31012

Fiscal Year 2021 Dodge County T-Splost Part 2
Infrastructure
Results
GA

Fiscal Year 2021 LMIG Projects
Results
Eastman, GA

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Repaving at Middle School
Infrastructure
Post-Bid
Eastman, GA 31023

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

LMIG Street Resurfacing
Results
College Park, GA 30337

Fiscal Year 2022 LMIG Projects
Infrastructure
Results
GA

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

T32-D2-Pavepres-A2 SR87/117-122471
Infrastructure
Results
GA

2021 LMIG Project
Results
Mount Vernon, GA

Last Updated 05/20/2022 09:39 AM
Project Title

Fiscal Year 2022 Dodge County T-Splost Part 2

Physical Address View project details and contacts
City, State (County) Eastman, GA   (Dodge County)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Grading, placing 19 mm asphalt base course, and 9.5 mm asphalt topping on 1 county road and placing OGI leveling and 9.5 mm asphalt topping on 1 county road. traffic control, shoulder building and grassing, and striping on both county roads.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents