Similar Projects
Westwood Golf Course Clubhouse - GOL-I-WWCLUB - City of Newton
Demolition, New Construction, Infrastructure
Conception
$1,150,000 CJ est. value
Newton, IA 50208

2024/25 Cyride Facility Improvements - City of Ames
New Construction, Renovation, Infrastructure
Conception
$750,000 CJ est. value
Ames, IA 50011

Casey's General Store - East 14th Street / Des Moines
New Construction, Infrastructure
Design
$1,500,000 CJ est. value
Des Moines, IA 50316

Casey's General Store - East 14th Street / Des Moines
New Construction, Infrastructure
Design
$1,500,000 CJ est. value
Des Moines, IA 50316

Gerber Collision & Glass at Williams Pointe / Waukee
New Construction, Infrastructure - 14,221 SF
Bidding
$3,000,000 CJ est. value
Waukee, IA 50263

Gerber Collision & Glass at Williams Pointe / Waukee
New Construction, Infrastructure - 14,221 SF
Bidding
$3,000,000 CJ est. value
Waukee, IA 50263

Love's #476 Lube Pit
Addition - 8,400 SF
Post-Bid
$500,000 to $1,000,000 est. value
Davenport, IA 52806

Tesla Supercharge Locations
New Construction
Post-Bid
Cedar Rapids, IA

Loves Travel Stop #882
New Construction - 9,580 SF
Results
$1,000,000 to $5,000,000 CJ est. value
Muscatine, IA 52761

Christian Brothers Automotive
New Construction - 5,400 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Grimes, IA

Mid American Dsm Service Center
Renovation - 119,555 SF
Construction
Des Moines, IA 50320

Iowa Travel Center
New Construction - 9,750 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Duncombe, IA 50532

Kum & Go Grand Avenue and Raccoon River Drive / West Des Moines
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
West Des Moines, IA 50266

Electric Vehicle Charging Station - ECON-21-001 - City of Norwalk
Infrastructure
Conception
$325,000 CJ est. value
Norwalk, IA 50211

AutoZone #1912 / Cedar Rapids
New Construction, Infrastructure - 7,800 SF
Design
$1,500,000 CJ est. value
Cedar Rapids, IA 52404

Last Updated 12/27/2022 07:31 AM
Project Title

Repair Shop Concrete Replacement

Physical Address View project details and contacts
City, State (County) Ames, IA 50010   (Story County)
Category(s) Commercial
Sub-Category(s) Gas Station, Vehicle Sales/Service
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $118,800 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

It is the intent of the Iowa DOT to award the contract to the responsible bidder whose submitted quotation is the most advantageous to the Iowa DOT, cost and other factors considered. Other factors include, but are not limited to: meeting or exceeding mandatory requirements, proposed staffing, and meeting required time schedule. Overview: Repair Shop Concrete Replacement: Contractor to remove noted concrete and grassy areas for replacement, and concrete area on west side to be coordinated with separate contract for drain replacement. Concrete approach to overhead doors to be sloped away from building. Existing stoops to remain and portion of the existing sidewalk. Concrete replacement to meet specs provided. Work to be done during regular days and hours Monday - Friday 7:00 AM - 4:30 PM (CST). DOT to employee 3rd party testing agency for concrete and fill testing to be coordinated by contractor when testing needed. All concrete on West side of Repair Shop to be completed first with North side concrete to follow. Warranty: 1 year warranty on labor Estimated start date: November 18, 2022 - or upon award once notice to proceed email has been issued. Estimated completion date: West side concrete - December 1, 2022 & remaining North concrete - June 1, 2023 Until the contract is awarded the sole point of contact for this project is Tiffany Stupp (see bid contact information) any and all questions related to this project are to be submitted to Tiffany Stupp through the IONwave Bid system. (See the cut off period for questions) This is project is exempt from state sales tax. Davis-bacon wages do not apply. IADOT - Repair Shop Concrete Replacement

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents