Similar Projects
Research Lab Improvements
Renovation
Post-Bid
Norman, OK 73069

Nursing Simulation Lab
Addition - 3,400 SF
Post-Bid
Kansas, OK

Kiamichi Tech Stigler Campus Remodel
Renovation
Bidding
Stigler, OK 74462

Shepler Center Elevator Addition
Addition
Post-Bid
Lawton, OK 73505

Bathroom Renovation for McClarren Hall - Connors State
Renovation
Post-Bid
Warner, OK

Gallogly Hall 4th Floor Project
New Construction
Post-Bid
Norman, OK

Biomedical Science Building 7th Floor Lab
New Construction
Bidding
Oklahoma City, OK 73104

WCC Office Renovation
Renovation
Results
$622,000 est. value
Oklahoma City, OK 73105

University Of Tulsa Thomas Plaza
Renovation, Alteration
Design
Tulsa, OK 74104

Renovation Project
New Construction
Design
Durant, OK

OU Rowing Training Room
New Construction
Post-Bid
Norman, OK 73019

Moore Norman Technology Center Steel Building
New Construction
Post-Bid
Norman, OK

Devon Energy Hall Room 210 Office Buildout
Build-Out
Post-Bid
Norman, OK 73069

ORU Library and Holy Spirit Research Center
Renovation
Post-Bid
Tulsa, OK 74171

Reported 11/17/2021 12:00 AM
Project Title

Hot Tub Renovation

Physical Address View project details and contacts
City, State (County) Oklahoma City, OK 73104   (Oklahoma County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work: Remove existing tile from surfaces. Cut and remove concrete deck from perimeter of hot tub. Removal of earth from perimeter of hot tub. Re-Configure the current concrete steps leading into the hot tub to allow for a shallower step depth. Potentially replace hot tub's current mechanical pump given unique circumstances. To be determined. Apply concrete water-tight sealant to interior surfaces of the hot tub's concrete shell. Re-Plumb all of the water jets to the pump. Pressure test all lines. Replace earth and concrete around perimeter. Re-Tile surfaces. New tile needs to match existing surfaces as much as possible. Samples or pictures needed prior to installation. Replace existing handrails.

Details

College/University, Renovation.
Division 03 - Concrete.
Division 07 - Thermal and Moisture Protection.
Division 09 - Finishes.
Division 22 - Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents