Similar Projects
Reconstruction of Harwinton Avenue
Post-Bid
Plymouth, CT 06782

Litchfield High School Sidewalk and Curbing Replacement
Post-Bid
Litchfield, CT

Hickory Hill Road Reconstruction Project
Results
$6,000,000 to $7,000,000 est. value
Thomaston, CT 06787

Indefinite Quantity Construction Services for Road & Bridge Maintenance
Results
$1,000,000 est. value

Asphalt Shimming 2021
Post-Bid
Goshen, CT

Road Rehabilitation 2021 - Phase B
Results
$807,008 est. value
New Milford, CT

Asphalt Reclamation Services
Infrastructure
Post-Bid
Plymouth, CT

Road Rehabilitation 2021 - Phase A
Results
$814,445 est. value
New Milford, CT

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Pavement Preservation Project Asphalt Rubber Chip Seal
Results
$1,000,000 to $2,499,999 est. value
Easton, Fairfield, Goshen, Roxbury, Torrington, Washington, CT

Construction of Three (3) Parking Lots Along Greenway Community Trails
Infrastructure
Post-Bid
Litchfield, CT

City North Reconstruction Phase 2021.1
Results
Torrington, CT

Kent Village Center Streetscape Improvements - Phase One
Infrastructure
Post-Bid
Kent, CT

New Preston Center Sidewalks
Infrastructure
Results
$90,000 to $120,000 est. value
Washington, CT 06794

Annual Chip Seal Bid
Term Contract
Post-Bid
Goshen, CT

Reported 05/27/2022 12:00 AM
Project Title

Reconstruction Various Roads

Physical Address View project details and contacts
City, State (County) Torrington, CT   (Litchfield County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project work is comprised of furnishing all equipment, labor, material, plant, and superintendence to perform all work necessary for the removal of existing roadway and sidewalks, new concrete curbing, new paving of roadway, new bituminous concrete sidewalk, driveway aprons, replace existing concrete encased corrugated metal pipe with new pipe, reset catch basin and manhole tops, traffic markings & signs and associated miscellaneous work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents