Similar Projects
Straits Fishing Pier Replacement
Post-Bid
Beaufort, NC 28516

Cedar Island Dock Repairs
Post-Bid
Cedar Island, NC 28516

Repairs to North Topsail Beach Access Sites #1, #2
Results
Less than $99,744 est. value
North Topsail Beach, NC

Fonta Flora State Trail - Linville Access Boardwalk
Results
NC

Provide Shoring Systems Columns
Post-Bid
$25,000 to $100,000 est. value
Cherry Point, NC 28533

Demolition and Replacement of the Park Street Pier - Hurricane Florence Damages
Results
Emerald Isle, NC

Major M & R of Concrete Wharf at USCG SFO Fort Macon, Atlantic Beach, NC
Post-Bid
$1,000,000 to $5,000,000 est. value
Atlantic Beach, NC 28512

Demolition and Replacement of the EI Woods Pier - Hurricane Florence Damages
Results
Emerald Isle, NC

New River Waterfront Park Repairs
Post-Bid
Less than $500,000 est. value
Jacksonville, NC 28540

Demolition and Replacement of the Cedar Street Pier - Hurricane Florence Damages
Results
Emerald Isle, NC

Dowdy Park Phase III
Post-Bid
Nags Head, NC

Repairs to North Topsail Beach Access Site #4
Results
North Topsail Beach, NC

FY 20/21 Capital Improvement Project Admiral Street Public Beach Access
Post-Bid
Nags Head, NC

Dolphin Piling Repair at Elizabeth II for Roanoke Island Festival Park
Results
Less than $22,000 est. value
Manteo, NC 27954

Poe`s Ridge Boat Ramp Area Site Preparation
Post-Bid
$25,000 est. value
Moncure, NC 27559

Reported 12/17/2020 12:00 AM
Project Title

Repair Multiple Docks

Physical Address View project details and contacts
City, State (County) Cherry Point, NC   (Craven County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the partial demolition and repair of four damaged docks, the replacement of the decking with fiberglass reinforced plastic grating and incidental related work. No piles will be replaced as part of this project.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents