Similar Projects
General Wayne A. Downing Peoria International Airport
Renovation, Infrastructure
Bidding
Peoria, IL

Aggregate, Bituminous Patching Materials, Liquid Asphalt, Pipe Culverts
Term Contract
Post-Bid
Norwood, IL 61604

Road Salt
Post-Bid
North Chicago, IL 60064

Furnish and Apply 9,446 Gallons of Bituminous Materials
Results
Less than $56,865 est. value
Brimfield, IL

5.75 Miles of Resurfacing on I-74 From W of Kickapoo/Edwards Rd to 0.7 Mile E of I-474
Results
IL

Central Division - Asphalt Paving Maintenance
Post-Bid

Seal Coat
Results
Less than $38,474 est. value
Glasford, IL 61533

Street Maintenance - Sealcoating and Fog Coating
Post-Bid
Mapleton, IL

Reconstruction of Western Avenue
Results
Peoria, IL 61525

Street Maintenance - Sealcoating and Fog Coating
Post-Bid
Bartonville, IL

Princeville District Office Pavement Replacement
Results
Princeville, IL

Street Maintenance - Sealcoating
Post-Bid
Elmwood, IL

Kickapoo Creek Road Structure Replacement
Results
Less than $1,500,000 est. value
Peoria, IL

Construct Base Track
Post-Bid
$250,000 to $500,000 est. value
Peoria, IL

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

Last Updated 09/10/2021 07:39 AM
Project Title

High Quality Aggregate Polymer Modified Slurry Seal Contract - 2021

Physical Address View project details and contacts
City, State (County) Peoria, IL   (Peoria County)
Category(s) Heavy and Highway
Sub-Category(s) Aggregates, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed improvement consists of applying High Quality Aggregate Polymer Modified Slurry Seal on surfaces at locations designated in the bid document or as directed by the City. Work may also include crack sealing, or other types of construction as needed. The Contractor shall furnish all materials and equipment, and provide all traffic control. It will be the responsibility of the Contractor to sweep the streets before the slurry seal is applied. Necessary adjustments, incidentals, and appurtenant items shall be constructed as directed by the City.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents