Similar Projects
Gas Station and Convenience Store
New Construction - 161,000 SF
Construction
$10,000,000 CJ est. value
South Windsor, CT

ANZ Petroleum
New Construction - 2,088 SF
Construction
$600,000 est. value
Bristol, CT 06010

Newington Development
New Construction - 76,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Newington, CT 06111

Design, Construction, Financing, Operation & Management of Landside Real Estate Development at Hartford-Bradley International Airport
New Construction
Results
Windsor Locks, CT 06096

Two Brothers Auto
New Construction - 9,000 SF
Design
Bloomfield, CT

7-Eleven
New Construction - 4,714 SF
Design
Southington, CT

Nobl Gas
New Construction - 11,634 SF
Design
Enfield, CT

DPW Fuel Station Improvements
Renovation
Results
Windsor, CT 06095

Carstar East Hartford
Addition
Pending Verification
East Hartford, CT

East Hampton Road Mixed-Use
New Construction - 10,000 SF
Design
Marlborough, CT

Citgo
Renovation - 1,600 SF
Construction
Bloomfield, CT

Sunoco Gas Station and Jersey Mike's / Southington
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Southington, CT 06489

Sunoco Gas Station and Jersey Mike's / Southington
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Southington, CT 06489

7-Eleven #34962 / Southington
Demolition, New Construction, Infrastructure - 4,714 SF
Pending Verification
$1,500,000 CJ est. value
Southington, CT 06489

7-Eleven #34962 / Southington
Demolition, New Construction, Infrastructure - 4,714 SF
Pending Verification
$1,500,000 CJ est. value
Southington, CT 06489

Last Updated 11/09/2022 08:34 AM
Project Title

Sunoco

Physical Address View project details and contacts
City, State (County) Windsor, CT 06095   (Hartford County)
Category(s) Commercial
Sub-Category(s) Gas Station, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $57,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 9, 2022, this is in conceptual design. An architect has not been disclosed. A general contractor has not been selected. Although a firm timeline cannot currently be established, construction is not expected to commence prior to April 2023.

Details

1 Story Above Grade, 1,500 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents