Similar Projects
5000 Building Walkway Bridge Repair and Renovations
Renovation
Post-Bid
$850,000 to $900,000 est. value
Darlington, SC

Design Build Firm HopeHealth Campus Site Improvements
New Construction, Addition
Post-Bid
Florence, SC 29501

Rehabilitation
Infrastructure
Results

Hartsville Area Schools Resurfacing Project
Infrastructure
Results
Hartsville, SC 29550

Hydroponic Lab Foundation and Plaza
Renovation, Infrastructure, Alteration
Post-Bid
$75,000 to $90,000 est. value
Hartsville, SC 29550

Road Improvements Package 1
Infrastructure
Results
Florence, SC 29505

Allen Street Pump Station, Farm Street and South Main Street Sewer Upgrades
Infrastructure, Renovation
Post-Bid
$850,000 CJ est. value
Darlington, SC 29532

Intersection Improvement - US 52/401/15
Infrastructure
Results
SC

Biscuitville / Hartsville
New Construction, Infrastructure - 2,734 SF
Post-Bid
$600,000 CJ est. value
Hartsville, SC 29550

Preservation - District 5
Infrastructure
Results

Safety Improvements- District 5
Infrastructure
Results

Reconstruction/Rehabilitation - Darlington Co
Infrastructure
Results
SC

Palmetto Street and Church Street Streetscape
Infrastructure
Results
$500,000 est. value
Florence, SC

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Zion Road Pump Station Rehabilitation / Upgrade
Renovation, Infrastructure
Results
$506,325 CJ est. value
Lamar, SC 29069

Last Updated 09/26/2022 11:58 AM
Project Title

Hurricane Creek Bridge Replacement Project

Physical Address View project details and contacts
City, State (County) Darlington, SC 29540   (Darlington County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected May 2019 , Construction documents
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of November 26, 2018, this project is on hold due to over budget of the bid received. This project consists of the removal and disposal of an existing 2-span concrete bridge deck, and mid-span concrete pile cap and timber piles: and replacement by a single span, pre-fabricated steel bridge superstructure with open-grate decking and modified concrete pier cap/approach slabs utilizing the remaining timber end bents. The proposed bridge structure will be 60ft long by 16ft wide. Construction Cost Range: $300,000 to $500,000 Bid Security Is Required in an Amount Not Less Than of the Base Bid.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents