Similar Projects
Williamsville CSD - Capital Repairs 2021
Renovation
Bidding
Buffalo, East Amherst, Williamsville, NY 14051

The Summit Center - Addition & Renovations
New Construction, Renovation, Addition - 16,500 SF
Sub-Bidding
$2,500,000 to $3,000,000 est. value
Buffalo, NY 14228

Depew Union Free School District Capital Outlay Project 19/20
Post-Bid
Depew, NY 14043

Maryvale UFSD 2019-20 Capital Outlay Project
Post-Bid
Cheektowaga, NY 14225

Frontier CSD 2018 Capital Project Phase 2
Results
Hamburg, NY

Capital Improvement Project - Phase 3
Renovation
Results
Less than $5,600,000 est. value
Amherst, NY 14226

Alden Central School District - Vision 20/20 Phase 2
Renovation
Construction
Alden, NY 14004

Orchard Park Central School District – 2018 Capital Project
Construction
West Seneca, NY 14224

Cleveland Hill UFSD Smart Schools Bond Act
Post-Bid
Cheektowaga, NY 14225

2018 Capital Improvement Project - Phase 1A and 2
Results
Less than $12,000,000 est. value
Cheektowaga, NY 14225

Elmwood Village Charter School Expansion
Addition - 57,455 SF
Construction
$1,270,000 est. value
Buffalo, NY 14201

Lancaster CSD Renovations 2018 - Phase 2
Renovation
Post-Bid
Lancaster, NY 14086

North Collins Central School District Capital Outlay Project 2019-2020
Results
North Collins, NY 14111

2018 CIP for Williamsville Central School District Music Facility
Construction
Less than $26,569,887 est. value
Amherst, Williamsville, NY 14221

Lake Shore Central School District Capital Improvement Project 2017 – Phase 3
Post-Bid
Less than $12,000,000 est. value
Angola, NY 14006

Last Updated 03/04/2020 11:16 AM
Project Title

Lake Shore Central School District Capital Improvement Project 2017 - Phase 2

Physical Address View project details and contacts
City, State (County) Angola, NY 14006   (Erie County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $14,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

At the High School, a two-story addition will be built at the southwest corner of the existing building. The addition will include a secure entrance to the existing Gym, new Locker Rooms, Concession space, Rest Rooms, Athletic Department offices, and various instructional spaces. Site upgrades include parking lot and sidewalk reconfigurations to accommodate the building addition and a bus loop; underground stormwater treatment and storage; drainage improvements, and new entrance to the track. Building upgrades include renovation of the existing Tech Classrooms; Pool bleacher replacement and new Pool covers; renovation of a Pool Locker Room; retrofit of the Gym bleachers, replacement of the Gym divider curtains, and refinishing of the Gym floor; and relocation of an existing stairwell. At the Middle School, site upgrades include the installation of an underground stormwater treatment and storage system, and improvements to the parking lots, bus loop, sidewalks, lighting, water main, and drainage. A small addition will be built at the back of the building for exterior-access Rest Rooms. Building upgrades include new Pool covers; new Locker Room partitions and hand dryers; replacement of the wood Gym floor, Gym bleachers, and basketball backstops; interior and exterior door replacement; creation of a secure entrance; reconfiguration of the Main Office, Nurse’s Office, and Lobby Rest Rooms; renovation of the Auditorium and balcony; fire alarm system replacement; minor abatement work; finish upgrades; and various HVAC, plumbing, and electrical upgrades. Multiple Contract Project consisting of the following prime contracts a) Contract 201 — Site Work b) Contract 202 — General Trades — HS Addition c) Contract 203 — General Trades — HS and MS Renovations, and MS Addition d) Contract 204 — General Trades — HS and MS Additions and Renovations e) Contract 207 - Plumbing f) Contract 208 — Mechanical (HVAC) g) Contract 209 — Electrical

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents