Similar Projects
Brookfield Square Mall
New Construction, Demolition, Infrastructure - 600,000 SF
Design
$81,000,000 est. value
Elm Grove, WI 53122

Northwest Highway (Sth 83) Const / PSRS40
Infrastructure
Design
$1,000,000 CJ est. value
Mukwonago, WI 53149

CTH B; Intersection with Morgan Road
Infrastructure
Bidding
$500,000 CJ est. value
Oconomowoc, WI 53066

CTH B; Intersection with Morgan Road
Infrastructure
Bidding
$500,000 CJ est. value
Oconomowoc, WI 53066

Culverts and Guardrails
Post-Bid
Waukesha, WI

2021 Road Improvement Program
Post-Bid
Delafield, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Local Road Maintenance
Results
WI

Milwaukee Baseball Academy Expansion
Addition, Demolition, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Menomonee Falls, WI 53051

North Springdale Road Warehouse Addition
Addition, Demolition, Infrastructure
Pending Verification
$500,000 CJ est. value
Waukesha, WI 53186

STH 16, 5,800' West of STH 83 STH 190
Infrastructure
Bidding
$2,000,000 CJ est. value
Nashotah, WI 53058

Town Hall Drive Reconditioning
Renovation
Post-Bid
Eagle, WI

Crack Sealing Various City Streets
Results
Waukesha, WI

Pewaukee - Milwaukee, Pilgrim Road / Capitol Drive, B-67-0086
Infrastructure
Bidding
$499,999 CJ est. value
Brookfield, WI 53045

Asphalt Concrete Paving - County Highway System
Infrastructure
Post-Bid
WI

Last Updated 08/08/2022 11:42 AM
Project Title

Kelly Lakes Double Box Culvert Replacement

Physical Address View project details and contacts
City, State (County) New Berlin, WI 53151   (Waukesha County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $350,541 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves the removal and replacement of two concrete Box Culverts, removal and replacement of 18-inch cmp, water main relocation, minor ditch grading, cast-in-place concrete apron construction, asphalt pavement replacement, erosion control and restoration. The project consists of furnishing all labor, equipment, and materials necessary to perform the work as called out on the plans. The work consists of Staking, Traffic Control, Erosion Control, Flow Diversion, the removal and replacement of two concrete Box Culverts, removal and replacement of 18-inch CMP, Water Main Relocation, Minor Ditch Grading, cast-in-place Concrete Apron construction, Asphalt Pavement replacement, and Restoration. Approximate items of work are listed below: Staking, Traffic Control and Erosion Control with Flow Diversion Remove Existing Box Culverts (2), Head Walls, and Wing Walls, Replace with 42 ft Precast 10' x 4' Box and 42 ft Precast 8' x 4' Box, Water Main Offset, appx. 65 ft, Precast Wing Walls and Precast Concrete Apron, Ditch Grading to Blend, Asphalt Binder and Surface Coarses. Restoration Pre-Qualification:Yes

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents