Similar Projects
Stanly Facilities Master Plan
New Construction
Conception
Albemarle, NC 28001

Main, Powell and Gee Buildings Renovations
Renovation - 42,500 SF
Conception
$42,000,000 est. value
Graham, NC 27253

Popp Martin Student Dining Renovations
Design
Charlotte, NC

Herring Hall Cosmetology Renovation
Renovation - 5,960 SF
Design
$1,200,000 est. value
Wilkesboro, NC 28697

Western Carolina University H.F. Robinson Administration Building Suite 420 Renovation
Renovation
Bidding
Cullowhee, NC 28723

Native Prairie Observation Deck Roof
Renovation
Bidding
Haw River, NC

Eastern Wake Site General Education Building 1 and Student Services
New Construction - 110,000 SF
Sub-Bidding
$49,500 est. value
NC

Bioinformatics 4th Floor Build-Out
Build-Out
Post-Bid
$10,500,000 est. value
Charlotte, NC

UNCSA - New Residence Hall
New Construction - 129,999 SF
Post-Bid
Less than $46,000,000 est. value
Winston-Salem, NC 27127

UNCG Athletics Coleman Building Weight Room Renovation
Renovation
Results
Greensboro, NC

Transportation Welding and Collision Lab Expansion
Renovation
Results
Flat Rock, NC 28731

Livingstone College F. George Shipman Science Center
Addition - 14,106 SF
Construction
Salisbury, NC 28144

ECU Life Sciences and Biotechnology Building
Construction
Less than $76,000,000 est. value
Greenville, NC 27834

Tate + Gate Cultural Arts Center
New Construction - 20,000 SF
Conception
Greensboro, NC 27403

NCCU Collaborative Research and Learning Center
New Construction - 5,000 SF
Design
$3,000,000 est. value
Durham, NC

Last Updated 03/28/2022 08:47 AM
Project Title

Camp Building 134-G Pawprint Renovation

Physical Address View project details and contacts
City, State (County) Cullowhee, NC 28723   (Jackson County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Interior Selective Demolition and Renovation and New Exterior Entrance: Interior non-structural demolition of existing kitchen and meeting room including: portions of walls, existing floor and ceiling finishes, casework and electrical components. New storage room and accessible entrance to the exterior will be constructed. New electrical work will consist of the installation and relocation of outlets and switches where demolition has occurred and relocation of lighting. New electrical work will accommodate exterior lighting and access control. HVAC will be modified for the new layout.

Details

College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents