Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

2021 Fulton County Seal Coat Project
Infrastructure
Bidding
Less than $1,135,225 est. value
OH

Crack and Joint Sealant (MBE Only)
Term Contract
Bidding

Adrian Street Resurfacing
Post-Bid
Delta, OH

Pre-Qualified Traffic Paint (MBE Bidders Only)
Term Contract
Post-Bid

Asphalt Repair
Results
Swanton, OH 43558

Permanent Improvement Projects, Paving and Drainage
Results
Swanton, OH 43558

North Star Bluescope Steel US Route 20A Turn Lane
Post-Bid
$202,200 est. value
Wauseon, OH 43567

Bridge L23.9 Guardrail
Results
Less than $110,000 est. value
Wauseon, OH 43567

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

(Part A) Mainline Pavement Reconstruction Milepost 46.50 to Milepost 50.92 and (Part B)Toll Plaza 49 Site Construction Milepost 48.8 to Milepost 49.1
Results
$34,200,000 est. value

Traffic Paint (MBE Bidders Only)
Term Contract
Post-Bid

Bridge E12.5 Guardrail
Results
Less than $45,245 est. value
Wauseon, OH 43567

Pre-Qualified Arrow Boards
Term Contract
Results

Portable Changeable Message Signs
Term Contract
Results

Last Updated 05/13/2021 02:04 PM
Project Title

Partial Interchange Resurfacing Interchange

Physical Address View project details and contacts
City, State (County) OH   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal by milling of three (3) inches of existing interchange asphalt pavement and shoulders at plan specified locations, resurfacing of the interchange pavement and shoulders to the thickness specified in the Drawings, installation of raised pavement markers and permanent pavement striping and/or other pavement markings, upgrading of guardrail, installation of SNAPs, and temporary traffic control. Partial Interchange Resurfacing Interchange 25 Eastbound and Westbound Ramps Milepost 25.30 to Milepost 26.10. The Small Business Enterprise (DBE/EDGE/SBE) Goal applicable to this Project is 10%.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents