Similar Projects
Plymouth Rubber Redevelopment Buildings 5 & 6
New Construction - 650,480 SF
Conception
Canton, MA 02021

Glen Brook Way - Phase 2
New Construction
Conception
$14,900,000 est. value
Medway, MA

East Milton Square Mixed Use
New Construction - 18,800 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Milton, MA 02186

Kingswood Commons
New Construction - 4,400 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Foxborough, MA

Elevator Maintenance and Repair Services
Alteration
Post-Bid
Quincy, MA

Balcony Repair, Kevin F. McGuire Housing
Renovation
Results
$178,850 est. value
Norwood, MA 02062

Exterior Siding, Storm Door Replacement Phase 2, Washington Heights 200-1 - General Bids
Renovation
Results
Less than $538,100 est. value
Norwood, MA 02062

Timber Crest Estates
New Construction
Construction
$61,448,981 est. value
Medway, MA 02053

Willows at Medway
New Construction - 11,472 SF
Construction
$60,310,000 est. value
Medway, MA 02053

Liberty Street Units
New Construction
Pending Verification
Quincy, MA

The Overlook
New Construction, Renovation
Pending Verification
$4,849,530 est. value
Weymouth, MA

Colonial Village Apartments
Renovation
Design
Weymouth, MA 02188

Accessible Unit Conversion, O'Brien Towers - Filed Sub Bids
Renovation
Results
Less than $600,000 est. value
Quincy, MA 02170

1080 Beacon Street
Renovation
Construction
$5,250,000 est. value
Brookline, MA 02446

Old Colony Avenue Apartments
New Construction
Pending Verification
Quincy, MA

Last Updated 12/23/2021 11:16 AM
Project Title

Termite Damage Repairs, Hemenway School Apartments 667-3

Physical Address View project details and contacts
City, State (County) Canton, MA 02021   (Norfolk County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $151,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certification Required. The Project consists of: Demolition of termite damaged structure and materials, restored walls and interior finishes, partial replacement of ceiling, new paint walls and ceiling, removal of items to be reinstalled, new bath shower and surround, new floor finishes, minor electrical upgrades

Details

Division 00 - Procurement and Contracting Requirements.
Division 02 - Existing Conditions, Demolition, Structure Demolition, Asbestos Remediation, Asbestos Abatement.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Thermal Insulation.
Division 08 - Openings.
Division 09 - Finishes, Gypsum Board, Resilient Flooring, Carpeting, Tile Carpeting, Painting and Coating.
Division 11 - Equipment, Residential Appliances.
Division 12 - Furnishings, Window Shades, Roller Window Shades, Countertops, Plastic Countertops, Plastic-Laminate-Clad Countertops, Bath Furnishings.
Division 22 - Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents