Similar Projects
Union Expressway - Missouri Department of Transportation
New Construction
Conception
$12,200,000 est. value
Washington, MO

New Fire Station - Washington
New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Washington, MO 63090

Highway 47 and Highway 50 Intersection Development
Alteration
Design
$5,300,000 est. value
Union, MO 63084

Agricultural Building - Union R-XI School District
New Construction, Infrastructure - 20,000,000 SF
Design
$5,400,000 CJ est. value
Union, MO 63084

Playground Replacements-Meramec State park
Renovation, Infrastructure
Bidding
$120,000 CJ est. value
Sullivan, MO 63080

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Union R-XI High School Greenhouse Replacement
Demolition, New Construction, Infrastructure
Post-Bid
$75,000 CJ est. value
Union, MO 63084

Downtown Improvements Phase 1 and Phase 2
Infrastructure
Results
New Haven, MO

Denmark Road Phase 3 Bridge
Renovation, Infrastructure
Results
Union, MO 63084

Lux Living South Kingshighway Boulevard Mixed-Use
Demolition, New Construction, Infrastructure
Pending Verification
$51,000,000 CJ est. value
Saint Louis, MO 63110

Lux Living South Kingshighway Boulevard Mixed-Use
Demolition, New Construction, Infrastructure
Pending Verification
$51,000,000 CJ est. value
Saint Louis, MO 63110

Old Pool Renovation - Washington
Renovation, Infrastructure
Conception
$389,000 CJ est. value
Washington, MO 63090

Aurora Estates Senior Living
New Construction, Infrastructure
Design
$11,200,000 CJ est. value
Pacific, MO 63069

Concrete Proposal
Infrastructure
Post-Bid
$800,000 CJ est. value
Berger, MO 63014

Kitchell Avenue Improvements
Infrastructure
Results
Saint Clair, MO 63077

Last Updated 06/22/2023 11:31 AM
Project Title

Resurfacing, Bridge Replacement, Guard Rail and ADA

Physical Address View project details and contacts
City, State (County) Saint Clair, MO 63077   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Schematic Drawings, Request for Qualifications, Construction start expected August 2024
Bids Due View project details and contacts
Estimated Value $18,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 2023, the project is in design. Contractor bidding is expected to commence in May 2024. Construction is expected to begin in August 2024.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents