Similar Projects
Chase Tank - City of Corona
Infrastructure
Conception
$6,000,000 CJ est. value
Corona, CA 92879

Main Library Remodel - 16-08 - City of Palm Springs
Demolition, Build-out, Infrastructure
Conception
$9,738,000 CJ est. value
Palm Springs, CA 92262

Dave's Hot Chicken / Cathedral City
Demolition, New Construction, Infrastructure - 2,675 SF
Design
$800,000 CJ est. value
Cathedral City, CA 92234

Dinah Shore Drive Multi-Residential and Self Storage Facility
New Construction, Infrastructure
Design
$55,000,000 CJ est. value
Rancho Mirage, CA 92270

RFQ Contractor - Water, Sewer and Water Reclamation Projects
Term Contract
Sub-Bidding
Corona, CA 92879

Fire Station No. 2 Rebuild - City of Corona
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Corona, CA 92879

RFP - Construction Management and Inspection Service for Citywide Pavement Rehabilitation Program Fiscal Year 2021-22 (Local Streets), and Pavement Rehabilitation
Infrastructure
Post-Bid
$509,000 CJ est. value
Moreno Valley, CA 92557

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Citywide Pavement Rehabilitation Program FY 2021/22 (Arterial and Collector Streets)
Infrastructure
Results
$18,746,665 CJ est. value
Moreno Valley, CA 92557

Construction of Bogert Trail Sewage Lift Station
Infrastructure
Construction
$2,342,139 CJ est. value
Palm Springs, CA 92264

Construction of Bogert Trail Sewage Lift Station
Infrastructure
Construction
$2,342,139 CJ est. value
Palm Springs, CA 92264

Amanda Ave and Winchester Road Mixed-Use
New Construction, Infrastructure - 7,550 SF
Pending Verification
$3,300,000 CJ est. value
Riverside, CA 92522

Wingsweep Parcels at Sommers Bend
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Temecula, CA 92590

BNSF Quiet Zone - Mission Inn Avenue, 3rd Street, and Spruce Street - 8610 - City of Riverside
Infrastructure
Conception
$3,200,000 CJ est. value
Riverside, CA 92501

Rehabilitate Mainline Pavement, Shoulders and Ramps
Infrastructure
Design
$191,557,000 CJ est. value
Riverside, CA 92506

Last Updated 12/20/2023 11:06 AM
Project Title

Lift Station 55-11 Capacity Upgrade Project

Physical Address View project details and contacts
City, State (County) Mecca, CA 92254   (Riverside County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $8,256,900 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 18, 2023, the project has not been awarded. A timeline for award has not been confirmed. To expand the lift station capacity within the site as current peak hour flows are nearing the total pumping capacity of the lift station. In addition, the new lift station will replace aging/failing infrastructure by constructing new pumps, odor control, electrical building, frontage improvements and emergency standby electrical power while addressing automation, redundacy, SCADA control, flow equalization, capacity, and efficiency. Project must include investigations, preliminary design, 30%, 60%, 90% and final design including bid phase services. Question Deadline 11/13/2023 at 12:00 PM PT Bidders must submit any questions or requests for clarification through online Bids by selecting the Q&A Tab Project Type RFP (Request for Proposal) Response Types Response File Type of Award Lump Sum Bid Valid 60 Days Liquidated Damages 1,950.00 per day Estimated Bid Value $5,812,000.00 Start/Delivery Date December 2023/March 2025 Project Duration 455 Calendar Days The method of Contractor Selection has not been Determined at this time.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents