Similar Projects
AI Influent Pump Station Improvements
New Construction
Design
Less than $2,900,000 est. value
Saint Augustine, FL 32080

66th Street Court East/64th Street Court East at Sr 64 Intersection Improvements
Infrastructure
Bidding
Bradenton, FL 34208

General Roadway and Miscellaneous Construction
Infrastructure
Bidding
Pompano Beach, FL 33069

Two Mini Circles on 79th Street South at 2nd Avenue and 4th Avenue
Post-Bid
Saint Petersburg, FL 33707

CR 238 North Widening and Resurfacing
Post-Bid
FL

Paving Lakeside Lane
Results
Grant, FL 32950

University/Merrill Roundabout Construction
Results
Jacksonville, FL 32203

West Palm Drive Pump Station and Force Main
New Construction
Bidding
Florida City, FL 33034

Deep Injection Well Pump Station Utilities and Concrete Containment
Post-Bid
$1,500,000 est. value
Naples, FL 34117

Detroit Boulevard Lift Station 50
Results
Less than $2,500,000 est. value
Pensacola, FL 32514

Front Beach Road Segment 4.1 Powell Adams
Post-Bid
Panama City Beach, FL 32413

Keevers Road Paving Improvement Project
Results
Less than $660,000 est. value
Sneads, FL 32460

UF-656 Campus Master Plan - Tigert Gateway
Post-Bid
$5,000,000 est. value
Gainesville, FL 32611

Sunland Estates Lift Station Replacement
Results
Less than $870,000 est. value
Sanford, FL 32771

Resurfacing Plan 2021 - Part 1
Post-Bid
$1,311,000 est. value
Miramar, Pembroke Pines, FL 33027

Last Updated 07/23/2021 10:25 AM
Project Title

Fisheating Creek Wildlife Management Area Campground Improvements - Phase II

Physical Address View project details and contacts
City, State (County) FL   (Glades County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $750,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Utility and road improvements to and existing campground which includes the construction of a new lift station.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Storm Drainage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents