Similar Projects
East Elden Street (From West Of Van Buren Street To Fairfax Co Parkway) - 03-ST-97-001 - Town of Herndon
Alteration
Conception
$44,690,000 est. value
Herndon, VA 22095

Herndon Parkway/Spring Street Intersection To Fairway County Parkway - 03-ST-08-002 - Town Of Herndon
Alteration
Conception
$14,316,000 est. value
Herndon, VA

North Section Rehabilitation - NP-GWMP 1(3), 2(5)
Design
$100,000,000 est. value
Arlington, VA

RFQ Contractor - Mount Vernon Recenter Renovation and Expansion
Addition, Demolition, Renovation, Infrastructure - 95,400 SF
Design
$44,000,000 CJ est. value
Alexandria, VA 22307

Smartscale* - E. Elden St. Duct Bank Construction
Infrastructure
Bidding
$12,671,000 CJ est. value
Alexandria, VA 22309

Lee Highway Pedestrian Improvements ----- Vsbep
Infrastructure
Bidding
$1,076,000 CJ est. value
Fairfax, VA 22030

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Turner Fairbank Highway Research Center Project VA ST TFHRC 50(5)
Post-Bid
$1,000,000 to $5,000,000 est. value
Fairfax, VA

Frontier Drive Extension and Braided Ramps
Results
Less than $89,500,000 est. value
VA

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

FDLLC Fairfax VA WAWA
Renovation, Demolition
Construction
Fairfax, VA 22031

Brown's Fairfax Mazda
New Construction, Demolition - 103,064 SF
Construction
Fairfax, VA 22030

Sheehy Automotive - Loisdale / Springfield
New Construction, Infrastructure - 52,000 SF
Pending Verification
$30,000,000 CJ est. value
Springfield, VA 22150

Parkview Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$250,000,000 CJ est. value
Herndon, VA 20170

South Patrick Street Median Improvements - City of Alexandria
Infrastructure
Conception
$3,381,000 est. value
Alexandria, VA 22314

Last Updated 08/19/2022 09:02 AM
Project Title

McLean Central Bridge Replacement

Physical Address View project details and contacts
City, State (County) McLean, VA 22101   (Fairfax County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $45,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 26th, 2022 this project is pending an award decision. QUESTIONS DIRECTED TO OWNER All questions concerning this project shall be directed to Ed Deleon, Project Manager, in the Planning & Development Division of the Fairfax County Park Authority. Ed can be contacted at 571-328-4568 between 8:00am-4:30pm Monday through Friday, or by email at least by 4:00 p.m. Wednesday, June 22, 2022. This office is the only point where information will be disseminated. The procedure specified under Section 2.2-4330(A) (i), VA Code Ann. shall apply: "... the bidder shall give notice in writing of his claim of right to withdraw his bid within two (2) business days after the conclusion of the bid opening procedure; ...". The Fairfax County Park Authority of Fairfax County, Virginia reserves the right to reject any and all bids, to waive informalities and irregularities in bidding, and to accept bids which are considered to be in the best interest of the Fairfax County Park Authority. Bids are hereby solicited for the removal of an existing approximately 36 ft wooden bridge, installation of a new 45 ft x 8' prefabricated fiberglass pedestrian bridge, four (4) helical anchors, concrete paving, and related work at McLean Central Park. The bridge structure, helical anchor design and all permits will be provided by the Owner. The Contractor will be responsible for removal and disposal of existing bridge, transporting the bridge parts from 1929 Pimmit Drive, Falls Church, VA 22043 to the work site and assembly of the bridge according to the bridge manufacturers recommendations. Work shall include but not limited as depicted on "Summary of Work". Project Substantial Completion must be met by Friday, September 16, 2022.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents