Similar Projects
Alyssum and Twinflower Storm Line Replacement - City of Forest Grove
Infrastructure
Conception
$300,000 CJ est. value
Forest Grove, OR 97116

Park Place Bridgeport Mixed Use / Tualatin
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
King City, OR 97224

Cedarbrook Assisted Living And Memory Care
New Construction - 186,980 SF
Design
$10,000,000 CJ est. value
Tigard, OR 97281

Westbrooke Estates Mixed Use
New Construction, Infrastructure - 9,800 SF
Design
$55,000,000 CJ est. value
Hillsboro, OR 97123

OR 8 at East Lane (Cornelius) Project
Infrastructure
Bidding
$1,000,000 CJ est. value
Hillsboro, OR 97123

Onsite Sewer Assistance Program - Sewer Connection and Septic repair/replacement/decommissioning
Infrastructure
Bidding
$600,000 CJ est. value
Hillsboro, OR 97124

Beaverton Shelter Project - Bid Package One Early Procurement Electrical
Demolition, Infrastructure, Renovation - 12,000 SF
Sub-Bidding
$5,000,000 CJ est. value
Beaverton, OR 97005

Beaverton Shelter Project - Bid Package One Early Procurement Electrical
Demolition, Infrastructure, Renovation - 12,000 SF
Sub-Bidding
$5,000,000 CJ est. value
Beaverton, OR 97005

Tigard Street (Fanno Creek) Bridge Replacement - City of Tigard
Demolition, New Construction, Infrastructure
Post-Bid
$5,415,000 CJ est. value
Tigard, OR 97223

RFP Engineering - Consulting Services for Design and Implementation Support for the District's Advanced Metering Infrastructure Project
Infrastructure
Post-Bid
$111,000 CJ est. value
Tigard, OR 97223

SW Division Street Culvert Replacement Project (Rebid)
Infrastructure
Results
$1,349,930 CJ est. value
Aloha, OR 97007

ASR 3 and 2 Wellhouse Improvements
Renovation, Infrastructure
Results
$4,381,728 CJ est. value
Tigard, OR 97223

Century Boulevard/TV Highway Intersection #100294 - Washington County
Infrastructure
Construction
$3,691,800 CJ est. value
Hillsboro, OR 97123

Highway 99W Pedestrian Crossing Project - City of Sherwood
New Construction, Infrastructure
Pending Verification
$11,500,000 CJ est. value
Sherwood, OR 97140

Scholls Heights Apartments
New Construction, Infrastructure
Pending Verification
$81,500,000 CJ est. value
Beaverton, OR 97007

Last Updated 07/03/2023 09:42 AM
Project Title

RFP Construction Manager at Risk - CM/GC Services for Homeless Shelter

Physical Address View project details and contacts
City, State (County) Beaverton, OR 97005   (Washington County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Assisted Living Facility, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Proposers are required to certify non-discrimination in employment practices in accordance with ORS 279A.110(4), and identify resident status as defined in ORS 279A.120(1). Prequalification of proposers is not required. All Proposers are required to comply with the provisions of Oregon Revised Statutes andBeavertons Contract Review Board Policy. The City is seeking proposals from qualified CM/GC firms, Services for Homeless Shelter The City of Beaverton reserves the right (1) to reject any or all proposal not in compliance with public bidding procedures, (2) to postpone award of the contract for a period not to exceed ninety (90) days from date of proposal opening, (3) to waive informalities in the proposals, and (4) to select the proposal which appears to be in the best interest of the City Location- 11380 - 11390 SW Beaverton Hillsdale Highway 12,000 sf commercial building constructed in 1984 o One story, sprinklered, wood frame with brick veneer, newer roof o Site is @1acre with 59 surface parking spaces in front and back o Site is zoned RC-E (Regional Center-East), a mixed-use zoning designation o Adjacent land uses include retail services, office, OR-217 Project must be occupied by June 2025 ; . The City anticipates all work (including warranty phase) will be completed on or before August 31, 2025 As of July 1, 2023, a construction manager has been awarded.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents