Similar Projects
Last Updated | 02/11/2022 07:01 AM |
Project Title | Bituminous Pavement Surfacing |
Physical Address | View project details and contacts |
City, State (County) | WY (Park County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Involving bituminous pavement surfacing, traffic control, milling plant mix and miscellaneous work on approximately 10.20 miles on US 14/16/20 beginning at RM 10.249 between Yellowstone National Park and Cody in Park County. 1 106.05110 Field Laboratory 1.000 Ls 2 106.05200 Contractor Testing 1.000 Ls 3 109.04000 Force Account Work 40,000.000 $$ 4 109.08000 Mobilization 1.000 Ls 5 202.03120 Removal Of Signs (Est. Lump Qty: 42 Ea) 1.000 Ls 6 202.03170 Removal Of Guardrail 2,262.500 Ft 7 202.03260 Removal Of Pipe 30.000 Ft 8 202.03305 Milling Plant Mix 38,400.000 Sy 9 202.03500 Reset Mailbox (Single) 1.000 Ea 10 202.03520 Reset Mailbox (Multiple) 2.000 Ea 11 209.01000 Water 230.000 Mg 12 210.03300 Motor Grader 100.000 Hr 13 210.03610 Excavator 32.000 Hr 14 211.03315 Culvert Cleaning 13.000 Ea 15 215.01000 Contractor Storm Water Control 1.000 Ls 16 215.03402 Excelsior Sediment Log 500.000 Ft 17 216.03100 Seeding (Pls) 320.000 Lb 18 216.03120 Fertilizer Type i 600.000 Lb 19 216.03900 Dry Mulch 30.000 Ton 20 217.01010 Geotextile, Erosion Control 30.000 Sy 21 301.01010 Pit Run Subbase 2,900.000 Cy 22 401.02000 Hot Plant Mix 26,650.000 Ton 23 401.02040 Test Strip 1.000 Ea 24 401.02055 Hot Plant Mix Approaches 1,050.000 Ton 25 401.03321 Asphalt Binder (Pg 58-28) 1,700.000 Ton 26 407.01000 Tack Coat 50.000 Ton 27 409.02100 Fog Seal 30.000 Ton 28 409.03070 Chip Seal 170,000.000 Sy 29 409.03085 Emulsified Asphalt Modified 300.000 Ton 30 412.01000 Curb (Plant Mix) 2,300.000 Ft 31 413.01000 Hydrated Lime 275.000 Ton 32 499.03046 Reclaimed Asphalt Pavement Widening 1,100.000 Cy 33 511.06000 Machine-Placed Riprap 30.000 Cy 34 603.50024 Cmp 24 In 30.000 Ft 35 606.02000 Corr Beam Guardrail (Self-Oxidizing) 1,787.500 Ft 36 606.03000 Corr Beam Guardrail End Anch Type a (Self-Oxidizing) 12.000 Ea 37 614.01000 Erosion Control Concrete 10.000 Cy 38 640.00004 Special Item Ea-a 14.000 Ea 39 640.00007 Special Item Ft-a 7,400.000 Ft 40 702.20100 Reference Markers 17.000 Ea 41 702.20200 Reference Marker Panels 17.000 Ea 42 702.30105 Sign Posts, Wood 4 x 6 In 410.000 Ft 43 702.30110 Sign Posts, Wood 6 x 6 In 170.000 Ft 44 702.30115 Sign Posts, Wood 6 x 8 In 180.000 Ft 45 702.30450 Sign Panels, Extruded Aluminum 25.000 Sf 46 702.30500 Sign Panels, Aluminum 410.000 Sf 47 702.51010 Flexible Delineators, Type Ii 70.000 Ea 48 702.51020 Flexible Delineators, Type Iii 990.000 Ea 49 703.03100 Flagging 3,000.000 Hr 50 703.03110 Temporary Traffic Control 1.000 Ls 51 703.03200 Sequential Chevron 1.000 Ls 52 703.03210 Portable Variable Message Sign 2.000 Ea 53 799.70105 Thermoplastic Pavement Markings 168.000 Sf |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |