Similar Projects
Replace Hot and Cold Water Loops
Bidding
Less than $300,000 est. value
Ina, IL

Chiller
Bidding
Aledo, IL 61231

Club Fitness Roof and HVAC Replacement
Post-Bid
Addison, IL 60101

HVAC Services - Collinsville
Term Contract
Post-Bid
Collinsville, IL

HVAC Equipment Replacement
Results
Evanston, IL 60201

Boiler Replacement at Indian Trail JHS
Renovation
Results
Addison, IL 60101

Galesburg AC Replacement
Bidding
Galesburg, IL

2B Cooling System Upgrade
Post-Bid
Romeoville, IL

Hot Water Heater Replacement
Results
Rock Island, IL 61201

Update HVAC Controls - Temperature Controls
Bidding
Less than $700,000 est. value
Springfield, IL 62702

Coroner's Office Refrigerator and Freezer Replacement
Post-Bid
Wheaton, IL 60187

Shawnee Community College Emergency HVAC
Renovation
Results
$75,000 to $100,000 est. value
Ullin, IL 62992

Update HVAC Controls - General
Bidding
Less than $100,000 est. value
Springfield, IL 62702

USACE Chicago District - Replace IIB Cooling System
Post-Bid
$500,000 to $1,000,000 est. value
Romeoville, IL 60446

Campus Building Automation System Upgrade
Results
$600,000 to $700,000 est. value
Chicago, IL 60621

Reported 02/19/2020 12:00 AM
Project Title

HVAC Preventative Maintenance Services, NWS Romeoville, IL

Physical Address View project details and contacts
City, State (County) Romeoville, IL 60446   (Will County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be provided consists of two visits to perform semi-annual (fall and spring) preventive maintenance (PM) service for the heating, ventilation, air-conditioning (HVAC) system, and associated equipment listed in this Statement of Work (SOW). All items listed on the “HVAC Inspection Report” will be accomplished semi-annually, with exception of the annual belt replacement provision. All work shall be performed during normal business hours (8 AM – 4 PM) and the contractor shall schedule with the local National Weather Service Weather Forecast Office (NWS WFO) staff in advance to perform services. Contractor shall provide a minimum (5) business days advance notice before PM work is performed at the Weather Forecast Office (WFO), Radar Data Acquisition (RDA) facilities, including Transitional Power Maintenance Shelter (TPMS) building. This contract does not permit personnel, labor, materials, or refrigerant for repairs outside the Statement of Work (SOW). No action to correct any discrepancies/repairs out of the SOW shall be taken unless approved in advance and directed to proceed by the Contracting Officer.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents